Laserfiche WebLink
WESTERN FUELS - COLORADO <br />o' 300 ', 600' 900' A LIMITED LIABILITY COMPANY <br />ar.. <br />NEW HORIZON MINE <br />P.0 Box 628 NUO LA, CO. 81424 <br />ZONE 1 • 12.21 acres ` I <br />I <br />ZONE 4 54.33 acrr� <br />SUBSOIL: BENCH 1 SUBSTITUTE SUBSOIL <br />1 „ MAP 2.05.4 MORGAN PROPERTY <br />6 <br />33 AVG. THICKNESSI <br />r <br />sue.' <br />I ALL PLACED AS of JUNE 2010 TOPSOIL REPLACEMENT PLAN <br />33 1 � , <br />' I <br />NONE PLACED AS OF JtlNE. <br />2010 TOPSOIL: MIXED TOPSOIL AS OF JUNE 2010 <br />�21" AVG. ItHICKNE�S <br />ZONE 3 3`'x.68 acres <br />17" OF,TOP$OILIPLACED AS OF JUNE 2010 SCALE: -30M DWO, DATE: REV. NO, <br />SUBSOIL: LIFT B SOIL ! CONT. INTERVAL: CONT. DATE: REV. DATE: <br />0 <br />o <br />DRAWN BY: n-+ <br />l 33 AVG. THICKNESS I -,,- <br />CHKD BY. <br />i° ���0 3 <br />j ALL PLACED AS OF JUNE 2010 Ben Longenfeld, EIT <br />T JUL 0 2 2010 <br />rom on <br />No Lift A or Lift B stripping f Pd 011 , <br />TOPSOIL: MIXED TOPSOIL r ti. •� �1 f rtil ,. " <br />area. <br />i o <br />V s = <br />�21 ,r AVG. THICKNESS <br />PROPOSED <br />NONE PLACED AS OF JUNE 2010 <br />P 0 ND 01 I STOCKPILE 617 <br />I <br />_ -- - - _ - LIFT Be,G6 C <br />^n n o <br />_� PROPOSEDr <br />POND 011 - <br />STOCKPILE 108 <br />Pond Olt Jl...ir -rA 7.2eo cv <br />3.19 acres <br />''PRO 0 C.D__ <br />o�lfr0 9. <br />AREA OF SOIL l Uc 1,1 11 6_ b19 <br />PR,P7$EP li t fi¢ �9g6 ZONE <br />srciCKPILE 1b 1 IFT B roasi j I� Er r/` �rf /rrrrririr / <br />;,ers P N I' 1 €3,`2wey <br />STRIPPING REMAININt - <br />42 <br />LIFI':� 19i Bstb Y .;', 221',516 CY l .' J / / 12.21 <br />r /r� <br />AFTER JUNE 2010 <br />r/r r r <br />ZONE3 / Y ov s'i" r/ <br />E rrr <br />" //r r <br />.84 < 7 rrt <br />h <br />J011 <br />J WAPPROX. <br />// <br />PIT AREA AS OF "Dopo t`I _ _ <br />�� /r /r / /r/ <br />/ <br />> JUNE 2010 <br />ylOci<mi; 14 .: /r�/ /grey <br />/ <br />L11-1 <br />E4 <br />I� <br />ft A& B Undisturbed: C <br />--a - <br />h <br />I ZONE 2 - 7.84 acres <br />1 26.11 acres <br />SUBSOIL: BENCH 1 SUBSTITUTE SUBSOIL <br />a o <br />33" AVG. THICKNESS a <br />ALL PLACED AS OF JUNE 2010 <br />1 <br />Lift B only <br />?, i <br />- Undisturbed: 1.72 acres <br />�": + <br />TOPSOIL: MIXED TOPSOIL <br />r21" AVG. THICKNESS - - - - -- ---- - - - - -- j Q <br />PROPOSED NONE PLACED AS OF JUNE 2010 <br />Bench 1 stockpile for last 3 mine 1 ` - <br />pits <br />ZONES <br />j 5675 <br />1.90AC <br />(last 3 cuts x 115') x 1700ft1 x B hk = <br />ZONE 5 <br />132,222 cy stockpile y <br />1.90 AC <br />UNDISTURBED <br />BECAUSE OF <br />BLASTING RESTRICTIONS <br />i <br />5 <br />j <br />5b0 <br />6Fyo ; <br />1 17 <br />Table A Table B <br />Table C <br />2010 Topsoil Thickness of the yet to be disturbed land west of the TOPSOIL VOLUMES AVAILABLE AS OF MAY 2010 TOPSOIL VOLUMES REQUIRED IN EACH ZONE <br />active pit area. As of May 1, 2010 (Western portion of Zone 4) <br />2010 MIXED <br />= 132,271 CY (STOCKPILES 5 & 6) + 27,906 CY (77" PLACED IN ZONE 1) = 160,176 CY (100% recovery) ZONE 1 -12.21 ACRES x 43580 SF /ACRE x 211N/121N/FT = 34,472 CY OF MIXED TOPSOIL <br />Sample No. Lift A (inch) Lift B (Inch) 2010 LIFTA <br />= 146,337 CY (STOCKPILE 11) + 31,593 CY (AHEAD OF PIT)= 177,930 CY (100% recovery) 27 CF /CY <br />#19 9 44 LIFT A VOLUME (AHEAD OF PIT) ZONE 2 - 7.84 ACRES x 43560 SF /ACRE x 211N/121N/Fr = 22,135 CY OF MIXED TOPSOIL <br />26. 11ACx43580SF <br />#20 9 39 <br />/ACREx91N /121N= 31,593CY <== Thickness from Table A 27 CF /CY <br />11121 9 52 <br />27CF /CY <br />ZONE 3 - 31.68 ACRES x 43560 SF /ACRE x 211N/121N /FT = 93,702 CY OF MIXED TOPSOIL <br />#22 9 52 2010 LIFT B <br />#23 9 36 <br />= 221,516 CY (STOCKPILE 12) + 172,113 CY (AHEAD OF PIT) = 383,629 CY (100% recovery) 27 CF /CY <br />#24 9 53 LIFT B VOLUME (AHEAD OF PIT) <br />(8.11 AC <br />+ 1.72 AC) x 43560 SF /ACRE x 481N/121N = 172,113 CY <__= Thickness from Table A ZONE 4 - 54.33 ACRES x 43560 SF /ACRE x 24114I121N/FT = 175,304 CY OF LIFT A TOPSOIL <br />AVG 9 46 <br />27 CF /CY 27 CF /CY <br />Note: if there is more Lift A & B that what is shown above, R will be salvaged <br />SUBSOIL VOLUMES REQUIRED IN EACH ZONE <br />EXISTING TOPSOIL STOCKPILES & VOLUMES AS OF MAY 2010 <br />ZONE 1 - 12.21 ACRES x 43560 SF /ACRE x 331N /12IN/FT = 54,171 CY OF BENCH 1 SUBSTITUTE SUBSOIL <br />NOTEo OUTLINE OF EACH STOCKPILE IS SHOWN ABOVE <br />27 CF/CY <br />' <br />ZONE 2 - 7.84 ACRES x 43560 SF /ACRE x 331N/12IN/FT = 34,783CY OF BENCH 1 SUBSTITUTE SUBSOIL <br />27 CF/CY <br />e _ 8, 050 cy <br />` Mixed Topsoil <br />ZONE 3 - 31.68 ACRES x 43560 SF /ACRE x 331N /12IN/FT = 140,554 CY OF LIFT B TOPSOIL <br />27 CF /CY <br />146,337 c <br />ZONE 4 - 54.33 ACRES x 43560 SF /ACRE x 331N /l2lN /FT = 241,044 CY OF LIFT B TOPSOIL <br />Y <br />Lift A Topsoil <br />27 CF /CY <br />Legend <br />221,5 16 cy <br />124,221 cy Permit Boundary <br />Lift B Topsoil <br />Mixed Topsoil <br />MORGAN TOPSOIL STOCK PILE TOTALS (CY) <br />Disturbance Boundary <br />124,221 MIXED <br />8,050 MIXED <br />Pre -Mine Contours <br />132,271 MIXED <br />5820 <br />146,337 LIFT A TOPSOIL <br />221,516 LIFT 8 TOPSOIL <br />Post -mine Contours <br />AS OF APRIL 27, 2010 <br />Notes <br />1) For topsoil balance calculations, see narrative in section 2.05.4(2xd) Subsection 11.2.1 <br />2) From February 2008 to the end of the mine life, all Bench 1 material excavated from the <br />Morgan property will be replaced on the Morgan property. <br />MAP 2,05.4 -6 & 7 MORGAN TOPSOIL REPLACEMENT 30JUNEIO.dw <br />