Laserfiche WebLink
Table 2.06.6 -1 Rule 2.06.6 Requirements <br />Item <br />Location of Response <br />Comments <br />A - Soil Survey and <br />Section 2.04.9: <br />Determination of Prime <br />Identification of Prime <br />sub- section 10.0 <br />Farmland Soils was not <br />Farmlands <br />Attachment 2.04.9 -6 <br />made until 2008. TR -57 <br />addressed the need for <br />changes to topsoil handling <br />for prime farmland soils. <br />B - Topsoil Removal and <br />Section 2.04.9: <br />Replacement Methodology <br />sub- sections 16.4 & 16.5 <br />Section 2.05.4(2)(d): <br />sub- sections 11.0 <br />C - Topsoil Stockpile and <br />Section 2.05.4(2)(d): <br />Maps 2.05.4 -5, 6, & 7 <br />Storage Plans <br />sub- section 8.0 & 12.1 <br />contain locations and data <br />for Prime Farmland <br />stockpiles. <br />D - Suitable Subsoil <br />Section 2.05.4(2)(d): <br />Documentation <br />sub- section 6.0, 7.0 11.0 & <br />14.0 <br />E - Revecget tion Plans <br />Section 2.05.4(2)(e): <br />sub- sections 5.0, 7.0 & 9.0 <br />F - Certification of <br />Attachment 2.04.9 -6 & <br />Proposed Plans <br />Attachment 2.05.4(2)(e) -11 <br />- NRCS determination of <br />Attachment 2.04.9 -6 <br />Prime Farmland <br />Productivity <br />H - Return of Sail <br />Section 2.05.4(2)(e): <br />Productivity <br />sub- sections 5.6 & 5.7. <br />Section 2.05.4(2)(d): <br />sub- sections 13.1 & 14.0 <br />(Revised June 2010) 2.04.9 -4 <br />