Laserfiche WebLink
Dave Berry Letter Description Location of Answer <br />May 18, 2010 <br />Question # <br />6 All sections of the permit must be Throughout the entire PR-06 <br /> reconciled to provide consistent submittal. <br /> content compliance with all <br /> requirements. Although the land issues <br /> are extremely complex and <br /> voluminous, WFC has tried to provide <br /> this reconciliation among all sections <br /> of the permit. <br />7 All pending adequacy issues must be Throughout the entire PR-06 <br /> fully and adequately addressed. WFC submittal. <br /> has made a strong attempt to <br /> accomplish this, as each item is <br /> addressed in this letter. <br />8 All plans must be coordinated with the See revised Attachment <br /> landowners. Provide documentation. 2.05.4(2)(e)-8 <br /> WFC has revised the Morgan property <br /> reclamation to be exactly what they <br /> desire (full irrigated cropland). The <br /> Lloyd and Benson west properties have <br /> also been revised to include flood <br /> irrigated pasture, to the extent that the <br /> water is available. All properties on the <br /> east side of 2700 Road are in various <br /> stages of reclamation and many <br /> landowners have been present for the <br /> bond release inspections. <br />9 WFC disputes that soils management See attached documentation. <br /> practices were implemented without <br /> the consultation with the landowner. <br /> WFC continues to work with the <br /> landowner on the entire Permit <br /> Revision 06 and has provided a full <br /> copy of the submittal to them. WFC <br /> will also do its best to provide <br /> documentation of resolution of the <br /> permit issues, if they ever can be <br /> obtained. <br />12