Laserfiche WebLink
PR-06 2nd DESCRIPTION LOCATION OF ANSWER <br />Adequacy <br />June 2010 <br />Question # <br />80A Specify that Bench 1 Subsoil Substitute See Section 2.05.4(2)(d): <br /> will be subjected to the same sampling Tables 2.05.4(2)(d)-IA & B <br /> plan as Lift B Topsoil <br />80B Specify that 2°d phase sampling will take See revised Section <br /> place on a tighter grid than in the current 2.05.4(2)(d): sub-section 14.0 <br /> permit. & 15.0 <br />80C Commit to follow-up sampling that See revised Section <br /> ensures a maximum size of non- 2.05.4(2)(d): sub-section 14.0 <br /> remediated areas as determined by DRMS. & 15.0 <br />80D Commit to maintaining approved post See revised Section <br /> mine topography as part of spoil and soil 2.05.4(2)(d): sub-section 14.0 <br /> remediation. & 15.0 <br />81 State that replaced subsoil and topsoil will Resolved <br /> be measured and reported and submitted <br /> with the Annual Report. <br />82 Correct reference to Map 2.04.10-1 on Resolved <br /> page 2.04.9-9. Fix reference to Table <br /> 2.04.3-1 on the same page. <br />83 Clarify the increase in elevation on the Resolved <br /> Benson West property due to excess <br /> overburden from Morgan material swell. <br />84 Clarify the spoil spring potential water See revised Section 2.05.6(3) <br /> flows. Identify Spoil Spring Sample and Map 2.04.7-1A <br /> locations related to both NH2 and NH 1 <br />While this table contains a guide of where each item of adequacy is addressed, due to the overhaul <br />of several sections (2.04.9, 2.05.4(2)(d), & 2.05.4(2)(e)), it should not be used to substitute a <br />completer review of the sections for changes. <br />10