Laserfiche WebLink
<br />Table 1 <br />Transit Mix - Grisenti Gravel Pits <br />Actual/Projected Depletions from Mining Operation (2009-2011) <br /> Production Dust Exposed Water Surface Total <br /> Phase 1 Net Evap. Total Depletion <br /> Mined Water Dust Gross Total Effective Net Settling Phase 1 & from Mining <br /> Material Consumed Control Evaporation Precipitation Precipitation Evaporation Basin Area Settling Basin Operation <br /> (x 1000 tons) (ac-ft) (ac-ft) (ft) (ft) (ft) (ft) (acres) (ac-ft) (ac-ft) <br />Month <br />May-09 1 <br />11.96 2 <br />0.35 131 <br />0.09 1 4 <br />0.45 5 <br />0.13 [61 <br />0.09 f7l <br />0.36 8 <br />5.00 9 <br />1.80 10 <br />2.24 <br />Jun-09 1.7.50 0.51 0.33 0.55 0.10 0.07 0.49 5.00 2.43 3.28 <br />Jul-09 10.82 0.32 0.26 0.57 0.15 0.11 0.46 5.00 2.31 2.90 <br />Aug-09 10.36 0.30 0.29 0.51 0.16 0.11 0.40 5.00 1.98 2.57 <br />Sep-09 16.89 0.50 0.33 0.38 0.09 0.06 0.32 5.00 1.59 2.42 <br />Oct-09 11.42 0.34 0.18 0.26 0.07 0.05 0.21 5.00 1.06 1.57 <br />Nov-09 7 <br />65 0.23 0.01 0.15 0.06 0.04 0.11 5.00 0.54 0.78 <br />` <br />Dec <br />09 . <br />35.22; 1104, ' 0.42 Q1,1'. 64 <br />0.03 <br />0.08 <br />1Q.Ol) <br />0.84 .' <br />2.30 <br />- <br />Jan=10 21.79 0.64 " 042 0.11 _ 0.09 0:02 0.09' _`- 19.OQ 1.66 ' 2.73 .. <br />Feb 10'" 17.17 Q.Sl 0 Q0 , 0;1,3 I 0.04 0:03 0'40;- 19.00 19Q; ; ? 2 89 <br />Mar 10 25.32 0:75 0.4? 0 21 0 08... ; 0.06. 1S, ? 19.00 - 2 92 09 <br />A' r-10 195(2 0:57 , t 41. `- 0:34 0:11 .',0:8 . 4.95 <br />_ ; <br />5.93-,:: <br />09-10 Total 205.60 6.05 3.57 3.78 1.06 0.74 3.03 24.08 33.71 <br />lvlay-l0. 22.02 0 65 _ 0 42 0:45 0;1? 0:09 = 0 36 .? 11.00 • ", ' 6 $6> 7 93 <br />" <br />10 <br />^'7iIn 21 <br />31 0 63' ' 0.4f . 0155 0.70 ` 0;67, <br />- <br />0 49, <br />19.00 <br />: 9 23 <br />.10 ? <br />T <br />10 ' <br />]u1 . <br />. <br />?:. 22.02 0 b 642 .ti - 0.57. 0 15 ;; • 011 046,;, 19,.00 $ 7 .`_ 9 87 .' <br />' <br />. <br />pup <br />10 22 <br />03 0 65 , 0.42, ' , <br />0;51 0 16 '.? 041 OrW._ _ 19.Q0 ? 52 ;, 8 S9 <br />- <br />. <br />, <br />Sep,10 ., <br />. <br />` 21.31',. <br />069` <br />0.41 <br />0.38 <br />0.09 <br />0.06 <br />0.32 <br />19,.Q0 <br />606,. <br />" <br />" 710 <br />a <br />0'at-10 22 <br />02' 0,0: ` s 0'20' 0 ,QT 005 011 ; 19.00 -' 4.01' " 509 <br />Nov-10 . <br />. <br />21 <br />31 0.63. 0.41.•. - 0.1_;5 OOb. ? 0.04 Orll" 1900 . <br />6ec=10 ; <br />02 <br />22 = 0.65 ?• 0.42 0.11 0.04': ' 0.03 0.08' i. 19.00 1 6U 2 67 <br />t ti Ill . <br />02 <br />22 . <br />0165' 0.42,; 0.03. 0,02 0.09 , 19 00 <br /> <br />66 , <br />1 <br />i,1, <br /> <br /> <br />? . <br />2-7 <br />4 <br />, <br />Fels-11 . <br />60 <br />20 0 6 <br />1 0.13 004 ..-: 0;03 0,10' 1900 1 99 ; ; 2 99 <br />at?l l <br />IVT . <br />, <br />22 <br />02 , <br />0 65, 0,42 0;21 0 0$ . 0:06 0 15 `• 19 00 292' ' 4 OQ <br /> . <br />1f 3' <br />Al," <br />034, <br /> <br />1 <br /> <br />19.pQ <br /> <br />4.95 °° <br /> <br />. <br /> <br />S.?g•• <br />09-10 Total 26000 7.65 :5). l 3.78 .06 0.74 3.03 57.66 70.33 <br />Notes: <br />'Actual depletions through November 2009, projected depletions are shaded (December 2009 through Apni 1u11). <br />[11 Actual production provided by Transit Mix, projections based upon Transit Mix's projected maximum annual production. <br />[2] Based upon 4 percent water loss by weight. <br />[3] Actual dust control provided by Transit Mix. Projections based upon the annual total of previous monthly maximums spread out uniformly <br />over the year. <br />[4] Based upon NOAA Evaporation Atlas (45.4 inches per year), distributed monthly based upon State's SB-120 guidelines. <br />[5] Based upon average monthly precipitation data from the NOAA Climate Data (Canon City, 1950 - 2003). <br />[6] Effective Precipitation equals 70 percent of total precipitation, based upon the States' SB-120 guidelines, [5]' 0.7 <br />[7]- Net Evaporation equals Gross Evaporation less Effective Precipitation, [4] - [6]. <br />[8] Exposed water surface in settling pond is 5 acres or less prior to Dec 2009, and 19 acres or less after Dec 2009. <br />[9] Equals [7] x [8]. <br />[10] Total Depletion equals [2] + [3] + [9]. <br />The mining area is in hydraulic connection and within 100 feet of the Blue Heron pit, which in turn is within 100 feet of the river. De-watering from the pit <br />is assumed to be an instantaneous depletion to the river. Water pumped to the settling basin will be immediately returned to Brush Hollow Creek and <br />allowed to flow naturally back to the River. Based upon this, evaporation losses from the settling basin are assumed to be an instantaneous depletion to the <br />stream system. <br />BBA C.%D -umdgmi.p&we6WD kwp%Gd=Li%SWSPram2009CHW.ab I-P.&Vd e <br />?vater,nnaul?nn[n BISHOP-BROGOEN ASSOCIATES. INC. 1/412010 6:45PM AK