Laserfiche WebLink
<br />62 00 <br />8p?1 <br />o° <br />00% <br />00 <br />0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />_ E)=NG UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />i <br />® ACCEPTED GEOMEMBRANE <br />® PREVIOUSLY ACCEPTED GEOMEMBRANE <br /> <br /> <br />00 <br />00+010 <br />°o <br />N <br />I <br /> <br /> / W !? <br />/l CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br /> PHASE 5 VLF <br /> <br /> Tm <br /> PHASE 5 SECONDARY <br /> <br />OQ GEOMEMBRANE ACCEPTANCE <br /> f <br /> DT.SMM BY GMT C ga= BY JDN DATE <br /> C <br />O <br />a DRAWN BY CMT APPROVED BY JDH 06 <br /> + EARTH AND ENVIRONMENTAL CAW RUWAM Ms <br />- <br /> <br />C <br />w 1 <br />- 1 <br />5 <br />0 <br />,