Laserfiche WebLink
June 30,2010 <br />Gina Nance <br />Plant Manager <br />GCC Rio Grande <br />Pueblo Plant 3372 <br />Lime Road <br />Pueblo, CO 81004 <br />RE: GCC Pueblo Facility - As-Built Plans <br />Dear Mrs. Nance, <br />Pursuant to our meeting this past Monday, GCC Rio Grande, Inc. has retained us <br />to conduct an on-site evaluation of and prepare PE stamped as built drawings for <br />those certain structures located at GCC's Pueblo Portland cement manufacturing <br />facility (the "Facility"), identified on Exhibit A (the "Structures"). We understand that <br />our services are being retained in furtherance of GCC's submittal to the Division of <br />Reclamation, Mining and Safety of current information regarding structural <br />modifications and additions at the Facility since GCC's original receipt of its <br />reclamation approval ("DRMS Submittal"). <br />We completed our on-site evaluation of the Structures this morning and have <br />concluded that each of the Structures are in fact in the location indicated on GCC's <br />un-stamped plans for the Structures that are being included in the DRMS Submittal <br />and appear to be of the dimensions specified on such plans. <br />A team of Abel Consulting Services, Inc. (ACS) will field verify exact dimensions and <br />provide a stamped as-built site plan for each Structure. This field verification will <br />commence on July 6, 2010. <br />Please let me know if you have questions. <br />Sincerely, <br />Darlene K. E. Horn, P. . <br />102 S. Oneida St. • Pueblo, CO 81003 • Tel (719) 546-2235 <br />P.O. Box 1826 • Pueblo, CO 81002 • Fax (719) 546-2166 <br />E-mail; aep@abel-engineering.com