My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2010-06-28_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:45 PM
Creation date
6/29/2010 12:55:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
Response to preliminary adequacy issues for AM-01
From
Wildcat Mining Corporation (Greenberg Traurig)
To
DRMS
Type & Sequence
AM1
Email Name
WHE
SSS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
buried on site, please describe the measures taken to minimize disturbances to the <br />hydrologic balance, prevent off-site damage, and provide for a stable configuration <br />consistent with the proposed future land use, as required under Rule 6.3.4(1)(e). <br />Exhibit D- Reclamation Plan has been revised and is attached in Attachment 23. This adequacy issue was <br />addressed on page 1. <br />Attachment 26 <br />Although required by Rule 6.3.5(1), none of the maps submitted with AM-01 show any section <br />corners adjacent to the proposed operation. Please submit new maps which satisfy all map <br />requirements of Rules 6.2.1(2) and 6.3.5 <br />See attachment <br />Attachment 27 <br />Section 6.3.30)(e) indicates that the bench at the Level 2 portal will be extended. The Level 2 <br />portal is located on the north side of the access road and the existing bench extends beyond the <br />south side of the access road. Yet, according to Exhibit E-7, no reclamation is planned for any <br />portion of the bench located on the south side of the access road. Please correct Exhibit E-7. <br />A revised Exhibit E-7 was provided in Attachment 9. Please see attachment 9. <br />Attachment 28 <br />Please address the seventeen adequacy issues identified by the Division's Geochemist, David Bird. <br />Attached is a memo Attachment C-3a drafted to address all David Bird's adequacy issues. <br />Attachment 29-Attachment 44 <br />Adequacy issues 29-44 are addressed in the response to David Bird's adequacy issues with no <br />additional language to be inserted into the May Day Mine and Mill Amended Permit Application M- <br />1981-185. <br />June 28, 2010 Response To DRMS Adequacy Issues May Day Mine and Mill Amendment M-1981-185
The URL can be used to link to this page
Your browser does not support the video tag.