My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-06-28_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:08 PM
Creation date
6/29/2010 9:43:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
Exhibit 2 2008 Phase III Bond Release Evaluation -Year 2
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rio Tinto Energy America <br />Colowyo Coal Company, L.P. <br />i <br />00 <br />• <br />• <br />• <br />• <br />COLOWYO MINE <br />2008 PHASE III BOND RELEASE EVALUATION - YEAR 2 <br />REVEGETATION UNITS <br />IN PHASE III SAMPLING: REFERENCE AREAS: <br />EP001 <br />EP015 WP001 MOUNTAIN SHRUB <br />EP002 <br />EP016 WP002 SAGEBRUSH <br />EP003 <br />EP017 <br />EP004 <br />EP018 <br />EP005 <br />EP019 <br />EP006 <br />EP020 <br />EP007 <br />EP021 <br />EP008 <br />EP022 <br />EP009 <br />EP023 <br />EP010 <br />EP024 <br />EP011 <br />EP025 <br />EP012 <br />EP026 <br />EP013 <br />EP027 <br />EP014 <br />1.0 INTRODUCTION <br />Cedar Creek Associates, Inc. (Cedar Creek) was contracted in 2008 by Colowyo Coal Company <br />(Colowyo) to evaluate revegetated units for Phase III bond release at the Colowyo Mine. Units included <br />in this Phase III evaluation received a second consecutive year of sampling in 2008 and were established <br />and reclaimed between 1979 and 1995. Sampling was performed in the interest of ascertaining progress <br />toward revegetation success in general accordance with the proposed technical revision (TR -72) first <br />submitted by Colowyo in early 2008. Data and corresponding success testing in this document are <br />presented under the predication that the technical revision be acceptable to the Colorado Department of <br />Reclamation, Mining, and Safety (CDRMS). Revegetated areas evaluated in 2007 and 2008 consisted of <br />all or part of 29 units comprising 780.7 acres in East Pit and West Pit. In addition, two reference areas <br />(Mountain Shrub and Sagebrush) were sampled to provide cover and production comparison values to <br />facilitate an evaluation of success for the reclaimed units. Phase III bond release data analysis and <br />Cedar Creek Associates, Inc. Page 1 Colowyo Mine - Bond Release Evaluation <br />Phase III Year 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.