My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-06-28_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:08 PM
Creation date
6/29/2010 9:43:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
Exhibit 2 2008 Phase III Bond Release Evaluation -Year 1
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 SUCCESS EVALUATION <br />4.1 Ground Cover and Production <br />Success evaluations involve a direct comparison (and /or a reverse null statistical test) of appropriate <br />parameters for each variable of interest. Comparisons are made directly with either the reference area <br />parameters or the permitted standards. In the case of ground cover and production, comparisons are <br />directly made against weighted reference area data of the same year. In 2008, Cedar Creek was able to <br />make direct comparisons between the revegetated units included in Phase III bond release and reference <br />areas with regard to the variables of ground cover and production. Charts were developed to provide a <br />quick overview of the success of these revegetated efforts in comparison to reference area based criteria. <br />Chart 3 and Table 7 exhibit the results from ground cover sampling, and reveals that the Phase III <br />bond release area significantly exceeds the reference area comparison with 65.8% perennial cover versus <br />the 41.3% perennial cover standard (90% of 45.9 %). Chart 4 and Table 7 exhibit the results from <br />production sampling in 2008. This chart reveals that Phase III current annual production (1875.4 <br />perennial pounds per acre) is substantially higher than the success standard of 427.1 perennial pounds <br />per acre (90% of 474.6 ibs / ac). Moreover, Chart 4 reveals that Phase III current annual production is <br />at least double that found on the reference areas. <br />In Summary, Phase III areas addressed by this document strongly surpass the success <br />standards for around cover and production <br />Cedar Creek Associates, Inc. Page 25 Colowyo Mine <br />Phase III Bond Release Evaluation <br />
The URL can be used to link to this page
Your browser does not support the video tag.