My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-06-28_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:08 PM
Creation date
6/29/2010 9:42:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
Exhibit 2 2007 Phase II Bond Release Report
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />• <br />44% of its average precipitation in 2001, 61% in 2002, 86% in 2003, and 83% in 2004. Given this <br />• analysis the long-term average precipitation at the Colowyo mine is most likely in the 19 inch range as <br />opposed to the recent seven-year average of 17.7 inches. Therefore, precipitation during the 2006 / <br />2007 growing season (20.22 inches) was most likely only slightly above average as opposed to well <br />• above average. The growing season precipitation was about average with April, May, and June <br />exhibiting 0.92, 1.67, and 0.30 inches, respectively. <br />• <br />• <br />• <br />• <br />• <br />• <br />i <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />i <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• Phase III Bond Release Page 3 Colowyo Mine <br />•
The URL can be used to link to this page
Your browser does not support the video tag.