Laserfiche WebLink
• 3.0 Specific Reclamation Activities and Results <br />3.1 Phase I I I Areas <br />• <br /> <br />As shown on Exhibit 1 - 2010 Phase III Bond Release Application, each area requested <br />for bond release is comprised of smaller units, which correspond to the specific year <br />that backfilling, grading and reseeding were performed. The work completed includes <br />regrading to the approved post-mining topography (See Map 10, Permit C-81-019), <br />topsoil replacement to the required depth, and seeding with the approved seed mix. <br />Grading and topsoil replacement is generally performed in the summer and fall months <br />and seeding occurs in the fall. See Table 1 - Summary of Reclamation Activities for an <br />overview of the work performed for each reclaimed area. <br />Each of these areas have achieved the minimum ten years of responsibility required by <br />state statute for Phase III bond release. All areas included in this bond release <br />application also comply with the Phase I and II criteria set forth in the "Guideline <br />Regarding Selected Coal Mine Bond Release Issues", issued April 18, 1995. Below is a <br />bond release history for each of the reclamation blocks included in this application: <br />Table 3- Bond Release History for Phase 111 Areas <br /> Area Location Phase I Phase 11 Area Location Phase 1 Phase ll <br /> EP001 East Pit Sep-87 Sep-87 EP026 East Pit Apr-98 Aug-0 1 <br /> EP002 East Pit Sep-87 Sep-87 EP027 East Pit Apr-98 Aug-01 <br /> EP003 East Pit Sep-87 Sep-87 EP028 East Pit pending pending <br /> EP004 East Pit Se -87 Sep-87 EP029 East Pit pending pending <br /> EP005 East Pit Sep-87 Sep-87 EP030 East Pit pending pending <br /> EP006 East Pit Sep-87 Sep-87 EP031 East Pit pending <br /> EP007 East Pit Sep-87 Sep-87 EP032 East Pit end n pending <br /> EP008 East Pit Sep-87 Aug-01 EP033 East Pit ending pending <br /> EP009 East Pit Apr-98 Aug-01 EP034 East Pit endin <br /> EP010 East Pit A r-98 Au -01 EP035 East Pit din pending <br /> EP011 East Pit Apr-98 Aug-01 = WP001 West Pit Apr-98 Au -01 <br />W EP012 East Pit Apr-98 Aug-01 uj WP002 West Pit Apr-98 Aug-01 <br />Q EP013 East Pit Apr-98 Aug-01 Q WP005 West Pit pending pending <br />a EP014 East Pit Apr-98 Aug-01 a WP006 West Pit pending pending <br /> EP015 East Pit Apr-98 Au -01 WP007 West Pit pending pending <br /> EP016 East Pit Apr-98 Aug-01 <br /> EP017 East Pit Apr-98 Aug-01 <br /> EP018 East Pit Apr-98 Aug-01 <br /> EP019 East Pit Apr-98 Aug-01 <br /> EP020 East Pit Apr-98 Aug-01 <br /> EP021 East Pit Apr-98 Aug-01 <br /> EP022 East Pit Apr-98 Aug-01 <br /> EP023 East Pit Apr-98 Aug-01 <br /> EP024 East Pit Apr-98 Aug-01 <br /> EP025 East Pit Apr-98 Aug-01 <br />Phase 111 Bond Release Application <br />10