My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - P2008043
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008043
>
2010-06-28_REVISION - P2008043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:06 AM
Creation date
6/29/2010 7:21:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
NOI- Form 2
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD4
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 (Forth 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Land disturbance will consist of a 2 inch polyethylene pipe approximately <br />1500 feet in length laid on the ground surface between IN08-33-PW1 (the pump <br />-----._....-11-. -.......... _.W...-....... .................... -----................_-----------------.................. <br />test well) and the the stream tributary. Water will be discharged at the <br />stream tributary and monitored for erosion. If excessive erosion begins to <br />............._.-----.....---......---.-----......._....._----- -.......... _..........__ _-_...............- -.----._.....-........_......----._-............._........._ <br />take place beyond that which is natural, stream discharge will be terminated. <br />b. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: No drilling proposed. <br />A. Drill Pads: Quantity None_ Average width _____........... (ft) Average Length _-_ - - (ft) <br />B. Drill Holes: Quantity None Depth. _._ -------- - _----- (ft) Diameter (in) <br />C. Mud Pits: Quantity None„- Average Width..___ (ft) Average Length _ (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None. <br />D. Other Disturbances (please describe): <br />Infrastructure associated with this activity consists of 2 trailer mounted <br />electrical generators, 1 trailer mounted camper, and 1500 feet of polyethylene <br />pipe as shown in Attachment A. The electrical generators and camper will be <br />................... ----.-....--- ......... ... <br />situated in areas already bonded for disturbance under NOI P-2008-043 MD-01. <br />F. New R.oad(s): None Length - -' __ (ft) Width,--- (ft) <br />Significantly Upgraded Road(s) Length (i3) Width <br />Are culverts or other crossings proposed? If so, please describe: _ <br />- - -- - -------------------- -None. No new roads are planned. Access to the sites will be from <br />.-........._-------------------... _---------__..._..-..........--_------........---------------.....------- ------- - <br />adjacent existing roads. Only minor damage to existing vegetation <br />....._---- ............... <br />may occur during this activity.
The URL can be used to link to this page
Your browser does not support the video tag.