My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_PERMIT FILE - C1980007A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-04-26_PERMIT FILE - C1980007A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:44 PM
Creation date
6/28/2010 2:19:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
4/26/2010
Doc Name
Wetland Delineation Report
Section_Exhibit Name
Exhibit 82 Appendix I
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 1.0 Introduction <br />Barr Engineering Company (Barr) has completed the delineation and mapping of wetlands in an <br />unnamed gulch ( "Project Area ") in accordance with the U.S. Army Corps of Engineers Wetlands <br />Delineation Manual (1987 Edition) and the Interim Regional Supplement to the Corps of Engineers <br />Wetland Delineation Manual: Western Mountains, Valleys, and Coast Region (2008). The project <br />area is located within the eastern half of Section 15, Township 13S, Range 90W, near the <br />unincorporated town of Somerset, on the western border of Gunnison County, Colorado. The project <br />area, known as the "Refuse Pile Expansion East" is owned by Mountain Coal Company, LLC, as part <br />of their West Elk: Mine. A location map is provided in Figure 1. The project area is approximately <br />241 acres and is bounded to the north by State Highway 133 and the North Fork of the Gunnison <br />River, Box Canyon and Gunnison National Forest to the east, Gunnison National Forest to the south, <br />Sylvester Gulch and Mountain Coal Company West Elk Mine facilities to the west. Figure 2 provides <br />aerial photography that covers the entire Refuse Pile Expansion East project area. Barr Engineering <br />identified and delineated three wetlands onsite. Details of the delineation methodology and wetland <br />descriptions are reflected in later sections of this report. The wetland boundaries have been included <br />in most figures to provide context of their location in the landscape relative to environmental features <br />of interest, such as topography, soils, and vegetation. <br />• <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.