Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street <br />BARR Minneapolis, MN 55435 -4803 LOG OF BORING SB09 -12 <br />Sheet 1 of 4 <br />Project: Proposed Coal Handling <br />Location: West Elk Mine, Somerset, <br />I <br />client: Mountain Coal Company <br />Facilities <br />CO <br />Barr Project Number: 06/261004 <br />STANDARD PENETRATION <br />NATURAL DRY <br />TEST DATA <br />DENSITY <br />d <br />y <br />o <br />(\ <br />N in blows /ft @ <br />(pco <br />o <br />MATERIAL DESCRIPTION a <br />> 0 <br />10 20 30 40 <br />105 115 125 <br />cu <br />a <br />(ASTM D2488) a <br />z <br />w p <br />n <br />d o <br />SHEAR STRENGTH, ksf <br />Water Content, % <br />E <br />u) <br />Q X UC TV <br />WP WN WL <br />rn <br />Surface Elev.: 6260.0 <br />VS o VSR O <br />0 <br />1 2 3 <br />20 40 60 <br />CLAY (CL -CH) Brown, sand, gravel and silt. Slightly moist. <br />14 <br />q1 <br />COAL Black, mixed coaly gravel and silt with occasional vitrain 2.5 <br />\ <br />clasts. <br />28 <br />6 <br />6255 <br />5 <br />¢ <br />17 <br />COAL Black, mixed coaly gravel and silt. Silt zones up to 2" thick 7.5 <br />I <br />and siltstone clasts >1.5'. Moist and dry zones with wet zones <br />17 <br />7 <br />up to 3" thick. <br />'\ <br />6250--10- <br />\ <br />31 <br />31 <br />2 53 <br />19 <br />CC <br />19 <br />6245--15- <br />\ <br />33 <br />33 <br />I <br />6240 <br />20 <br />COAL Black, mixed coaly gravel and silt. Layers of fat clay up to 20.0 <br />3" thick. Dry with moist zones. Wet zones up to 2" thick. <br />22 <br />022 <br />6235--25 <br />11 <br />11 <br />I <br />1 <br />6230--30 <br />I <br />I <br />I <br />C ontinued e Pace <br />Completion Depth: 92.0 <br />Remarks: <br />Date Boring Started: 6/29/09 <br />Date Boring Completed: 6/29/09 <br />Logged By. BWL <br />SAMPLE TYPES WATER LEVELS <br />Drilling Contractor: Haztech <br />Drilling Method: HSA <br />While Drilling: <br />m Auger Cutting , Shelby Tube <br />Northing: <br />End of Drilling: <br />® Split Spoon n Rock Core <br />Eastin <br />hrs After Drilling: <br />10 <br />10 <br />10 <br />1 1— � v i ne transition may De graauai. Kevisea marcn 19, 2010 <br />