Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street <br />BARR Minneapolis, MN 55435 -4803 LOG OF BORING B -9 <br />Sheet 2 of 2 <br />Project: Proposed RPE Expansion <br />Location: West Elk Mine, Somerset, <br />client: Mountain Coal Company <br />CO <br />Barr Project Number: 06/261003 <br />STANDARD PENETRATION <br />NATURAL DRY <br />TEST DATA <br />DENSITY <br />o <br />\ <br />N in blows /ft O <br />(pcf) <br />MATERIAL DESCRIPTION <br />a <br />> 0 <br />10 20 30 40 <br />105 115 125 <br />0 <br />0 <br />0 <br />(D <br />(ASTM D2488) <br />a <br />F LL <br />d <br />E <br />d <br />(L`o <br />SHEAR STRENGTH, ksf <br />Water Content, % <br />W <br />O <br />E <br />N <br />Q X UC A TV )K <br />W WN WL <br />to <br />VS o VSR O <br />1 2 3 4 <br />20 40 60 <br />30 <br />SILTSTONE Light brown /grey very fine grained siltstone 30.0 <br />X X <br />50/ <br />50/1 <br />interbedded with sandstone. <br />X X <br />X X <br />X X <br />X X <br />1 <br />�� <br />X X <br />X x <br />X X <br />X X <br />98% <br />6750 <br />X X <br />X X <br />35 <br />SANDSTONE Medium -light brown /grey fine/very fine grained 35.0 <br />sandstone. <br />100% <br />6745 <br />40 <br />40.0 <br />45 <br />50 <br />55 <br />60 <br />Completion Depth: 40.0 <br />Remarks: <br />Date Boring Started: 6/24/09 <br />Date Boring Completed: 6/24/09 <br />SAMPLE TYPES <br />WATER LEVELS <br />Logged By. BWL <br />m Auger Cutting ,Shelby Tube <br />While Drilling: <br />Drilling Contractor: Haztech <br />Drilling Method: HSA/CORE <br />Northing: 401190.5 <br />® Split Spoon Rock Core <br />End of Drilling: <br />Eastin : 1450809.9 <br />hrs After Drilling: <br />1b <br />go <br />the stratification lines represent approbmate boundaries. The transition may be gradual. <br />