Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street <br />BARR Minneapolis, MN 55435 -4803 LOG OF BORING B -8 <br />Sheet 2 of 2 <br />Project: Proposed RIDE Expansion <br />Location: West Elk Mine, Somerset, <br />client: Mountain Coal Company <br />CO <br />Barr Project Number: 06/261003 <br />STANDARD PENETRATION <br />NATURAL DRY <br />TEST DATA <br />DENSITY <br />d <br />w <br />a� <br />rn <br />o <br />-d <br />m <br />3 0 <br />N in blows/ft OO <br />(pcf) <br />a <br />MATERIAL DESCRIPTION <br />ii <br />> 0 <br />10 20 30 40 <br />105 115 125 <br />.' <br />C <br />(ASTM D2488) <br />CL <br />° <br />SHEAR STRENGTH, ksf <br />Water Content, % <br />LLl <br />O <br />E <br />N <br />O X UC A TV X <br />WP WN W <br />a) <br />VS A VSR O <br />1 2 3 4 <br />20 40 60 <br />30 <br />SANDSTONE Light - medium grey sandstone interbedded with <br />•, <br />50/ <br />50/1 <br />siltstone. <br />1 <br />» <br />.. <br />53% <br />6745 <br />35 <br />35.0 <br />40 <br />45 <br />50 <br />55 <br />60 <br />Completion Depth: 35.0 <br />Remarks: <br />Date Boring Started: 6/24/09 <br />Date Boring Completed: 6/24/09 <br />Logged By: BWL <br />SAMPLE TYPES WATER LEVELS <br />Drilling Contractor: Haztech <br />While Drilling: <br />m Auger Cutting 'Shelby Tube <br />Drilling Method: HSA/CORE <br />End of Drilling: <br />Northing: 401418.0 <br />® Split Spoon a Rock Core <br />Eastin : 1450558.8 <br />hrs After Drilling: DRY <br />10 <br />0 <br />The stratification lines represent approbmate boundaries. The transition may be gradual. <br />