Laserfiche WebLink
TABLE 15 -8 <br />Ground Water Monitoring Frequencies <br />Yoast Mine <br />(Continued) <br />Site Name Water Levels Water Quality <br />YTM32 (Shop Well) - Annual A <br />SGAL70 (Seneca II Well GW- S70 -A) Annual Annual - A (Point of <br />Compliance) <br />- Indicates no monitoring <br />Annual: May /June <br />• <br />Water samples will be analyzed according to the (A) Ground Water Long Parameter List (Table <br />15 -4) or the (B) Ground Water Short Parameter List (Table 15 -4a). <br />Wells with a double strikethrough, and an 'Abandon' in the 'Water Levels' column, will be <br />abandoned. Wells with a single strikethrough will be suspended (ie, monitoring will be <br />discontinued until one year prior to final bond release). <br />(A) Contingent upon SCC's decision to put this well into service. <br />• <br />TR -39 27 Revised 1/09 <br />