Laserfiche WebLink
Annual = May /July (for Springs) <br />Water samples will be analyzed according to the (A) Surface Water Long Parameter List (Table 2) <br />or the (B) Surface Water Short Parameter List (Table 2a). Spoil springs will be incorporated into <br />the hydrologic monitoring program as they develop. <br />A survey will be conducted each year following the snowmelt, and the locations of all spoil <br />springs with discharges of at least 5 GPM will be reported to DMG in the next successive AHR. <br />Monitoring frequencies for spoil springs will be the same as those for above listed existing <br />springs. <br />NOTE: For all springs (native), spoil springs, and stream sites, when sampling for the Surface <br />Water Parameter Lists is required and flow is less than 5 gpm, only field parameters will be <br />measured. <br />• <br />TR -69 15 -3a -5 Revised 2/10 <br />TABLE 1 (cont.) <br />Springs <br />Monitoring <br />Frequency <br />Site Number <br />Discharge <br />Water Quality <br />Comments <br />(Computer ID) <br />S -7 (WSPG7) <br />Annual <br />Annual - A <br />At Smith Homestead <br />S -46 (WSPG46) <br />Annual <br />Annual - A <br />At 005 Dam <br />S -47 (WSPG47) <br />Annual <br />Annual - B <br />At Weather Station <br />S -50 (WSPG50) <br />Annual <br />Annual - A <br />Well W -24 French Drain <br />Spoil Spring 1 <br />Annual <br />Annual - B <br />At D Pit <br />(WSSPGI) <br />Spoil Spring 2 <br />Annual <br />Annual - A <br />Below Oil Well <br />(WSSPG2) <br />Spoil Spring 3 <br />Annual <br />Annual - A <br />Above 006 Pond <br />(WSSPG3) <br />Spoil Spring 4 <br />Annual <br />Annual - A <br />At Pond 006 Inlet Culvert <br />(WSSPG4) <br />Spoil Spring 5 <br />Annual <br />Annual - A <br />At Pond 16A Inlet Culvert <br />(WSSPG5) <br />Annual = May /July (for Springs) <br />Water samples will be analyzed according to the (A) Surface Water Long Parameter List (Table 2) <br />or the (B) Surface Water Short Parameter List (Table 2a). Spoil springs will be incorporated into <br />the hydrologic monitoring program as they develop. <br />A survey will be conducted each year following the snowmelt, and the locations of all spoil <br />springs with discharges of at least 5 GPM will be reported to DMG in the next successive AHR. <br />Monitoring frequencies for spoil springs will be the same as those for above listed existing <br />springs. <br />NOTE: For all springs (native), spoil springs, and stream sites, when sampling for the Surface <br />Water Parameter Lists is required and flow is less than 5 gpm, only field parameters will be <br />measured. <br />• <br />TR -69 15 -3a -5 Revised 2/10 <br />