My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-24_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2010-06-24_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:18 PM
Creation date
6/25/2010 11:10:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
6/24/2010
Doc Name
2-Dam Decant Grouting and 3-Dam Seep Water Management
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR9
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t"lr. Bnice Humphries <br />April 12.2000 <br />inflow from the main (Dam No, 1) decant pond. We have no documentation of the <br />historic closure of the system although it appears that the system is partiall%' silted. <br />Henderson proposes to close the decant system by installing a 300 ft. grout plug from <br />Decant Tower :N back towards Dam No. 2 (see Drawing 301-583 j. The length of the ? <br />plug has been recommended by Woodward-Clyde in a 1499 evaluation of the system. Z <br />W <br />Henderson will locate the 30-inch decant pipe and drill an initial hole into the concrete <br />pipe approximately 300' f 0-300) from Tower ?N. A 2-inch inside diameter grout casing = <br />V <br />will be inserted into the pipe to inject grout. A second hole will be drilled to"vards TowJ,r Q <br />5N at approximately 0+270. A grout casing will be inserted in this hole as well. A third <br />ventigrout hole will be drilled at 0-25 if necessary. Q <br />Once the vent and grout holes have been inserted. grouting will begin at the hole located <br />at 0-~-300. A low slump, low mobility grout consisting of peagravel, soil and cement will <br />be injected. Approximately 8 to 10 yards of grout will be placed at this location. This <br />will result in an initial solid grout plug of approximately 40-30 feet in length. The <br />ultimate compressive strength of this grout will be 700 - 1300 psi. Specifications for the <br />grout are attached. <br />Upon completion of the low mobility plug, a non-shrink slurry grout consisting of sand. <br />flyash and cement will then be injected at the hole located at 0-270. Groutine at this <br />location will continue until grout is observed at either the vent hole at 0_7 or at Tower <br />5N. Grout volumes will be checked to make sure that grout is not being lost,ornewhere <br />in the system. The ultimate compressive strength of this grout will be at least 3000 psi. <br />Specifications for the grout are attached. 411 grout holes will be backtilled with ,rout to <br />the surface upon completion of the grouting. <br />Henderson will have an independent testing facility collect and cast a minimum of tear <br />grout cubes from each type of grout used for compressive strength testing. The tests will <br />be conducted at 7-days, 14-days and 28-days (one cube will be a back up). A report will <br />he sent to the Division that will include grout volumes and the results of the concrete <br />compressive strength tests within 60 days of project completion. <br />Dam No, 3 Seep Collection System <br />Seepage from Dam No. 3 is currently collected from a series of toe drains in two <br />seepwater collection ponds at the toe of Darn No. 3. Seepage is then pumped back <br />tl-iough a I 0-inch diameter steel pipe that runs to the south of Dam No. 3 face and, <br />discharges the seepwater approximately 200 feet upstrearn of the crest. One 40-Itp pump. <br />rated at 500 gpm. is used to pump the average seepwater flow of 30 -,pm. <br />There are several potential problems with the current system. The location of the <br />dischar__e from the seepwater system could potentially cause some saturation ut the right <br />abutment area of Dam No. 3. In addition. the pH of the seepwater is bcmeea 21.5 and 3.5
The URL can be used to link to this page
Your browser does not support the video tag.