My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-24_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2010-06-24_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:29:18 PM
Creation date
6/25/2010 11:10:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
6/24/2010
Doc Name
2-Dam Decant Grouting and 3-Dam Seep Water Management
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR9
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i CLIMAX( MOLYBDENUM COMPANY HENDERSON OPERATIONS <br />L 1 4 Sub=dmry of Phelps Dodge Cerporavai 19302 Counry Road 3 <br />Parehell, Caforedo 80468 <br />13031569-3221 <br />Pax (97C) 72540036 <br />January 12, 2001 <br /> M <br />Mr. Allen Sorenson Z <br />Environmental Protection Specialist W <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 = <br />Denver, CO 80203 Q <br />RE: 3-Dam Seepwater Collection Project - Back-Up Pump Station CERTIFICATION, a <br />Henderson Mill, Technical Revision TR-09, Permit No. M-77-342 <br />Dear Mr. Sorenson: <br />This letter is to provide the Division of Minerals and Geology (Division) with the last required <br />certification for our new 3-Dam seepwater lines. A certification to the Division stating that the <br />old 3-Dam Seepwater pump station is operational is included with this letter. The Division <br />requested this certification in the 11114100-inspection report received from you. <br />The above mentioned inspection report asks for affirmation that both pumps are installed and in <br />working order at the 3-Dam pump station. Per our phone call this weep I clarified that only one <br />pump was rebuildable and reinstalled at the pump station. With this pump in place, the 3-Dam <br />pump station can function as an interim environmental protection facility (EPF). Adequate <br />storage capacity does exist in the 3 -Dam seepwater collection ponds to facilitate procuring and <br />installing a 2n° pump if necessary. <br />Please call if you have any questions or are in need of any further information. I can be reached at <br />(303) 569-3221 W. 2214. <br />Very truly yours, <br />L? j'f fl ? <br />Erich Bower <br />Environmental Engineer <br />Climax Molybdenum Company <br />Enclosure <br />Cc: Mike Ley - Climm <br />Rich Wagner - Climax <br />Dave Long - Climax <br />rte.
The URL can be used to link to this page
Your browser does not support the video tag.