Laserfiche WebLink
Mr. Jared Ebert <br />June 22, 2010 <br />Page 10 <br />CIVIL RES"OURCES <br />Department of Natural Resources Division of Water Resources, Office of the State Engineer <br />Per the SEO's letter, this site is operating under an approved Temporary Substitute Water Supply Plan and well <br />permit 65464-F. <br />Office of Archaeology and Historic Preservation <br />There are remnants of a railroad bridge across the South Platte River and portions of a railroad berm that will not <br />be disturbed by this mining operation. We added the location of these features to the Mining and Reclamation <br />Plan Maps. <br />Publication and Notices <br />43) In accordance with Rule 1. 6.2 (d) & (e) and Rule 1.6.5, within ten (10) days after the application was deemed <br />complete and submitted, you must have published a notice in a newspaper of general circulation in the locality of <br />the proposed mining operation once a week for four (4) consecutive weeks. Also, immediately after the first <br />publication you were to mail a copy of the notice to all owners of record of surface and mineral rights holders of <br />any recorded easements and all owners of record of lands that are within 200 feet of the boundary of the <br />affected land. Proof of notice and mailings such as Certified Mail Return Receipt Requested must be submitted <br />to the Division of Reclamation Mining and Safety prior to the decision date. <br />Attached please find proof that the notice was published as required in the Johnstown Breeze and the certified <br />mailing receipt to the owners of record as noted above. <br />Thank you for your assistance with this project. Please contact either Danna or Brad at 303.833.1416 if <br />you have any questions. <br />Sincerely, <br />Brad <br />Engi <br />Attachments <br />Exhibit A - <br />Exhibit C - <br />Exhibit F - <br />Exhibit S - <br />Attachment A - <br />Attachment B - <br />Attachment B1 - <br />Attachment B2 - <br />Attachment C - <br />Attachment D - <br />Attachment E - <br />vianner / rnncipai <br />Legal Description <br />Mining Plan Map <br />Reclamation Plan Map <br />Permanent Man-Made Structures <br />Project Sequence & Schedule <br />Floodplain <br />Town of Milliken Floodplain Regulations <br />FEMA Regulation Excerpt CRF 44, Development in Floodplain Submittal Requirements <br />Groundwater Monitoring & Mitigation Plan <br />Permanent Erosion Control Plan <br />Publication and Notices <br />CIVIL RESOURCES, LLC