My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-24_REVISION - C1994082 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2010-06-24_REVISION - C1994082 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:13:52 PM
Creation date
6/24/2010 12:59:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
6/24/2010
Doc Name
Application & Public Notice
From
DRMS Grand Junction Field Office (Emailed)
To
DRMS
Type & Sequence
TR48
Email Name
DTM
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />G-Z"zt'A?rn , 1F?-w <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFE*bI-' on <br />1313 Sherman Street, Room 215, Deaver, Colorado 80203, (303) 866-3567 ?l'lA <br />,SUN 2 201 APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />Uivra=? ' 5?`l <br />Thi??it?a?ust be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions are to <br />address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be submitted in order <br />for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, tables <br />and/or MifPR, with a revised table of contents, if necessary. The revision submittal date should be printed in the <br />lower right corner of each revision page. A cover letter to the revision should explain the nature of the revision and <br />reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br /> Permit No.: C - % - 082 Date: 06 15 2010 <br /> Permittee: Seneca Coal Company <br /> <br /> Street: 377% Routt County Road 53 <br /> P.O. Box 670 <br /> City: Hayden <br /> State: CO Zip Code: 81639 - <br /> Brief Description of TR-48, Aspen/Woody Plant Density Standard <br /> Revision: <br /> Public Notice Yes x No (Required for PRs and TRs) <br /> Attached: <br /> Bond Increase: Yes No X Federal X Non-Fedetal Mine <br /> Proposed Change in: <br /> Permit Area Mineral Surface <br /> Ownership Ownership <br /> Disturbed 1+/- 0. 0 Acre Private 0 0 Acres Private 0. 0 Acres <br /> <br /> Permit {+/_) 0 . 0 Acre Federal 0 0 Acres Federal 0 . 0 Acres <br /> <br /> Affected (+/-) O 0 Acre State (+/_{ 0 0 Acres State (+/-) 0 0 Acres <br /> s
The URL can be used to link to this page
Your browser does not support the video tag.