Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />........... <br />PROJECT IDENTIFICATION <br />Task #: 05a State :Colorado Permit/job# : M-1980-136 <br />County : Eagle <br />Site : Chambers Pit <br />Abbreviation :none <br />Filename :M136-05a <br />Date : 0611112010 <br />User: DMC <br />Agency or organization name: DRMS <br />Permit or other job action :112c SDG - <br />Task description :Apply topsoil over affected areas B, D, E, F <br />HOURLY EQUIPMENT COST <br />B chine 'Cat D10R - 10U (2005) Horsepower : 570 <br /> asic ma <br /> Blade type :Universal <br /> Attachment no. 1 : ROPS Cab Shift basis per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $76.61 NA <br /> Operating cost/hour : <br />E <br />$96.23 75 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $211.37 Total fleet cost/hour : $211.37 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 58,241 LCY factor : NA volume : 58,241 LCY <br />Source of estimated volume : Topsoil applied at 6" depth over approximately 72.2 acres <br />Source of estimated swell factor : NA - <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 500 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 416.2 LCY/hr Dozing method : 1.00 _(gen.) <br /> Visibility : 1.00 (avg.)- <br /> <br />: <br />-Material consistency description Job efficiency : 0.83 (1shift/day) <br />--- -- <br /> Spoil pile : 0.80 (fnd-rf) <br />Loose stockpile Push gradient: 0.90 <br />HB) <br />(Cat <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,550 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.78 <br />Weight description <br />Adjusted unit production : <br />322.94 <br />LCY/hr <br />Top -Soil <br />- -- - <br />Adjusted fleet production : <br />322.94 <br />LCY r <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 180.35 Hours <br />Unit cost : $0.655 /LCY Total job cost : $38,120