Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 02b State :Colorado Permit/job# :M-1980-136 <br />Abbreviation :none _ <br />Date : 06/11/2010 County: a le <br />Filename :M136-02b <br />User: DMC Site : Chambers Pit -- <br />Agency or organization name : DRMS <br />Permit or other job action :112c SDG -- <br />Task description : Grad pit slopes to 3H:1 V in areas E and remainder of F <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10U (2005) Horsepower: - 570 <br />--- <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br />(CRG) <br /> Data source:_ <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $76.61 NA <br />Operating cost/hour : $128.30 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $243.45 Total fleet cost/hour:- $243.45 <br />MATERIAL QUANTITIES <br />Swell <br />Loose <br />Initial <br />factor : <br />volume : 156,667 LCY <br />NA volume : <br />156,667 <br />LCY <br />Source of estimated volume :See attached -- <br />Source of estimated swell factor : NA <br /> Job Condition Correction Factors Source <br />HOURLY PRODUCTION <br />operator skill : <br />0.75 <br />(avg.) <br />Average push distance : 190 feet Material consistency : 1.20 <br />00 <br />1 (Cat HB) <br />Unadjusted hourly production : 1,091.4 LCY/hr Dozing method : . <br />1 <br />00 (avg <br />) <br /> Visibility : . . <br />- <br /> <br />Material consistency description : Job efficiency : 0.83 <br />80 <br />0 (1 shift/day_) <br />fnd- <br />( r) <br /> <br />Spoil pile : <br />. _ <br />-_ <br />Loose stockpile <br />---- Push gradient : 1.00 _(Cat HB)__- <br />o <br />Average push gradient : 0.00 /o (pos) <br />Altitude : <br />1.00 <br />85 <br />0 <br />- -(Cat - HB)- - <br />) <br />(Cat HB <br />Average site altitude : 6,550 feet Material weight : . <br />00 <br />1 _ <br />(S/SU/U) <br /> Blade type : . <br />Material weight : 2,700 Ibs/LCY Net correction : 0.51 <br />Weight description : <br />Adjusted unit production : <br />555.39 <br />LCY/hr <br />Earth --Wet excavated <br />- ---- - Adjusted fleet production : 555.39 LCY/hr <br />JOB TIME AND COST <br />1 Dozer(s) <br />Total job time : <br />282.08 <br />Hours <br />Fleet size : <br />Unit cost : $0.438 /LCY Total job cost : $68,672