My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-16_REVISION - M1987103
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987103
>
2010-06-16_REVISION - M1987103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:20 AM
Creation date
6/23/2010 12:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987103
IBM Index Class Name
REVISION
Doc Date
6/16/2010
Doc Name
Notice of Surety Increase (SI-01)
From
DRMS
To
Ace West Trucking, Inc.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name: DRMS <br />Permit or other job action :Final Reclamation Bond Update <br />Task description : Spread topsoil over lowere mine area <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 LGP - 7 Horsepower : 240 <br />Blade type :Straight <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Data source: - (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $44.90 NA <br />Operating cost/hour : $53.65 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $137.09 Total fleet cost/hour : $137.09 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 340 LCY factor : NA volume : 340 LCY <br /> <br />Source of estimated volume :Based on reclamation plan <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 175 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted hourly production : 326.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 0.99 (Cat HB) <br />Average push gradient : 1.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,000 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />600 Ibs/LCY <br />Material weight : 1 Net correction : 0.85 <br />, <br />Weight description <br />Top Soil Adjusted unit production : 277.55 LCY/hr <br /> Adjusted fleet production : 277.55 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 1.23 Hours <br />Unit cost : $0.494 /LCY Total job cost : $168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.