My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-16_REVISION - M1987103
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987103
>
2010-06-16_REVISION - M1987103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:20 AM
Creation date
6/23/2010 12:52:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987103
IBM Index Class Name
REVISION
Doc Date
6/16/2010
Doc Name
Notice of Surety Increase (SI-01)
From
DRMS
To
Ace West Trucking, Inc.
Type & Sequence
SI1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filename : M103-000 <br />Agency or organization name: DRMS <br />Permit or job action : Final Reclamation Bond Update <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />01a <br />02a <br />03a <br />04a <br />05a <br />06a <br />07a -Regrade Pit Highwalls <br />-Regrade Pit Bottom <br />-Move Rip-Rap Boulders to base of cliff <br />-Spread topsoil over regraded areas <br />-Spread topsoil over /owere mine area <br />-Regrading and Reclaiming access road <br />-Revegetation of 5 acres of disturbance dozer <br />dozer <br />dozer <br />dozer <br />dozer <br />excavate <br />revege 1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 17.9 <br />3.0 <br />5.5 <br />5.4 <br />1.2 <br />8.52 <br />16.0 $2,457 <br />$415 <br />$765 <br />$744 <br />$168 <br />$833 <br />$5,139 <br />08a -Mobilization mobilize 2 4.6 $2,189 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 62.3 $12,710 <br />" includes inflation factor adjustment of : NA % TOTAL DIRECT COST " =L____$12,710 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $257 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />?k 1I.4 <br />IV A <br />p1,L/7 <br />. not required (or eqp. operator serves as super.) TOTAL O & P = $1,661 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct+ O & P) = $14,371 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $719 <br />CONTINGENCY - NA* NA total = NA <br />" contingencies accounted for at task level TOTAL INDIRECT COST = $2,880 <br />TOTAL BOND AMOUNT (direct + indirect) _ $15,590 <br />County: Rio Blanco
The URL can be used to link to this page
Your browser does not support the video tag.