Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 0 2 <br />Agency or organization name: DRMS <br />Task #: 08a State :Colorado Permit/job #:M-1987-103 <br />Date : 0611612010 County: Rio Blanco Abbreviation :none <br />User: THM Site :East Douglas Pit Filename :M103-08a <br />Permit or other job action :Final Reclamation Bond Update <br />Task description : Mobilization <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />yin\I M^ArNA121 C C111DRAGRIT <br />Machine <br />Description Wei ht/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D7R DS Series 11 - 7SU 31.25 $40.93 $117.55 1 $158.48 $117.55 $250.00 <br />-Cat 320C 21.71 $26.97 $88.67 1 $115.64 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $274.12 $206.22 $500.00