My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-15_PERMIT FILE - P2010015 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2010015
>
2010-06-15_PERMIT FILE - P2010015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:13:08 PM
Creation date
6/23/2010 10:37:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2010015
IBM Index Class Name
PERMIT FILE
Doc Date
6/15/2010
Doc Name
New NOI application (non-confidential)
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (Form 2- Public) <br />3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />T e <br />;5 es Mated r n zero r loc !l /Z ' - W e e»r <br />;? ?so:0 w?,/G? sQlvayen' ar7ds>'oc /,led at AW up si a of fly Gr;/!pods. Once <br />;001 so 0,00!v 4 4.0 'alpe-V <br />red/s> iruted over ?*e f7r7oL 42A2eed42re45. For I'eClQh7Qrfor?L roses, /fls <br />0 C, 0: <br />Aw- <br />45S;UW?ed A*oil O.Oz*Vxlrn41e v4 /V 1rclx.5 ;Opooi ru///De OV'Wea e <br />4. Describe how drill holes will be plugged (refer to Rule 5A of the Rules for required abandonment procedures): <br />Sri/1 holes wir/be aba»donedtei their en:ti' - A//dril/ho/Ps Lvi!/Lx coru?/efe% <br />-filled with concre-fe, cement grout, or be» ' ni a rout fo event any e eoz <br />?s;?-e?tplon i'on daK r 7b peop/e a?ad irQ'ti!'e ghat r,?4y -traverse ,'he aYta - <br />r r , <br />b& V4uooed w?lfia a? cost or in sir4i ci+ment apLua orbrro' <br />sr¢iN At About 3 beef a/ow ?Ihe >bp of'y+he bedrtxlc surF• T ae Plug, ' <br />coo <br />not a{{? she /oa -terra ef?ectiveae5s a?di»tegri,?y o{,y?e ?,?%n4 ?,??u?• <br />Topsvw w.ll he spree over ° e p e P 9 <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Not a -plicab/e <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />ale5 OW // he ir7 sAP114 y 44?- ? le eh; rar,?e ?» ? temporQ r y, ta?v-s; ano'anda cress roods- <br />/mods and ZV' ilF*d.S.)Wil/ APe J'lPAlr/V d Apa 49 -Me copprvar 42 4y <br />ed e r / ord! din !e in Q <br />rou henec? cOgdithOn /'a'or 7'» p$oi/ r+e ce?»e»:' Qn rp?e+or/n . ,fie m0 n <br />r12U'QAi2n OC Ae reclaime c apya
The URL can be used to link to this page
Your browser does not support the video tag.