My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-22_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-06-22_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
6/23/2010 7:37:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/22/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 05/30/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 5, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 5/30/10 through 6/5/10 <br />Days S M T W T F S <br />Work Shifts - - D D D D D <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 41°F to 55°F (+/-) High: 66°F to 81°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No work activities were performed on Monday (5/31/2010) in observance of the Memorial Day <br />holiday. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />11) EARTHWORKS <br />A) Stripping <br />1) VLF <br />No work performed during the week. <br />B) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was performed prior to soil <br />liner fill (SLF) placement during the week. The area inspected and approved for placement is <br />shown in Figure 2. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A2+00 (+/-) and <br />A6+00 (+/-), approximately 0 to 100 feet left of centerline; between stations A10+00 (+/-) and <br />A30+00 (+/-), approximately 0 to 500 feet left of centerline; between stations C0+00 (+/-) and <br />C7+00 (+/-), approximately 40 feet left of centerline to 40 feet right of centerline; between <br />stations E0+00 (+/-) and E10+00 (+/-), approximately 50 feet left of centerline to 100 feet right <br />of centerline; between stations G24+00 (+/-) and G30+00 (+/-), approximately 0 to 150 feet <br />right of centerline; between stations H26+00 (+/-) and H33+00 (+/-), approximately 300 feet <br />VLF Weekly Report WE 06.05.10.D
The URL can be used to link to this page
Your browser does not support the video tag.