My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-06-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
6/22/2010 7:36:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/21/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 05/16/2010 and 05/23/2010.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth S Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: May 29, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 5/23/10 through 5/29/10 <br />Days S M T W T F S <br />Work Shifts D D D D D D - <br /> - N N N N - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 39°F to 53°F (+/-) High: 53°F to 77°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Night shift operations were canceled for the remainder of the project, effective after the Thursday <br />5/27/2010 night shift. <br />No work activities performed between 5/29/2010 and 5/31/2010 in observance of the Memorial Day <br />holiday. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />No work performed during the week. <br />B) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was not performed during <br />the week. The area of previously approved subgrade is shown in Figure 2. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A16+00 (+/-) and <br />A32+00 (+/-), approximately 0 to 200 feet left of centerline; between stations C0+00 (+/-) and <br />C7+00 (+/-), approximately 60 feet left of centerline to 60 feet right of centerline; between <br />stations E4+00 (+/-) and E 15+00 (+/-), approximately 0 to 300 feet right of centerline; and <br />between stations G4+00 (+/-) and G25+00 (+/-), approximately 0 to 150 feet right of <br />VLF Weekly Report WE 05.29.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.