My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-21_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2010-06-21_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:13:39 PM
Creation date
6/21/2010 2:04:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
6/21/2010
Doc Name
Letter & Application
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR48
Email Name
SB1
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />jestoverg- bresnan.net <br />MINE ENGINEERING <br />MINE RECLAMATION <br />June 18, 2010 <br />Mike Boulay <br />Division of Reclamation, Mining & Safety <br />101 South 3`d Street, Suite 301 <br />Grand Junction, CO 81501 <br />Re: McClane Canyon Mining LLC, McClane Canyon Mine <br />Minor Revision Application No. 48 <br />Fiber Optic Line and Poles <br />Permit No. C-1980-004 <br />Dear Mr. Boulay: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />JUN 212010 <br />?. ;t ian ,i9on, <br />?X,ning and S Y <br />On behalf of McClane Canyon Mining LLC, enclosed is an application for a minor <br />revision to allow the Operator to installed telephone pole supports for a fiber optic cable <br />that extends from the mine office to the office trailer located on the mine bench. The <br />support poles will be used telephone poles approximately 15-foot tall. The reason for <br />the request is that the fiber optic cable is currently installed on the ground and is <br />occasionally damaged by wildlife. The used support poles will be obtained from the <br />Munger Canyon Mine. <br />The fiber optic line is approximately 2,370 feet long and it will require 12 support poles. <br />DRMS power line demolition estimates are about $5.60 per foot. I suggest this line <br />should be bonded for about twenty five percent (25%) of the power line cost or $1.40 <br />per foot. Thus the increase in reclamation estimate is $3,318 direct cost and about <br />$4,000 with burden added. <br />Amended page 2-28and Figure 2.2.2 are enclosed. Please call with any questions. <br />Sincerely, <br />E. Stover, P.E. <br />Consulting Engineer <br />cc: One Copy Denver Office
The URL can be used to link to this page
Your browser does not support the video tag.