Laserfiche WebLink
Page 1 of 1 <br />TABLE 1 <br />BOWIE NO. 1 MINE <br />SURFACE WATER MONITORING _ STREAMS <br /> <br />STATION <br />NO. <br /> <br />SW - 1 <br />PRESENTLY <br />MONITORED? <br /> <br />NO <br />PERMIT <br />ACTION <br /> <br />NONE REQUIRED <br /> <br />FLOW cfs <br /> <br />- • MUNI IUKINU t-K <br />FIELD <br />PARAMETERS <br /> <br />- - tUUtNGT <br />WATER <br />QUALITY <br /> <br />- - <br />MONITORED DRAINAGE <br />BASIN <br /> <br />WEST FORK TERROR CREEK <br />WATERSHED <br />AREA <br /> <br />18.44 sq.ml. <br /> <br />STREAM GAUGE TYPE <br /> <br />Stilling well and recorder <br />FLUME <br />SIZE <br /> <br />• - <br />INSTALLATION <br />DATE <br /> <br />Sep-82 <br />NOTES <br /> <br />Data recorder activated is 09/27/82. <br />Well and recorder attached to <br />existing culvert. <br />SW-2 NO NONE - • • • - - EAST FORK TERROR CREEK 5.94 sq.ml. Parshall flume and recorder 4' x 30" Sep-82 <br />SW-4 NO NONE <br />-- _ <br />- TRIBUTARY TO WEST FORK TERROR <br />CREEK 1.0 sq.ml. Crest stage gauge -- Sep-82 <br />SW - 5 YES NONE Monthly Monthly Quarterly STEVENS GULCH 4.01 sq.ml. Parshall flume and recorder 3' x 30" Sep-82 <br />SW-6 YES NONE Monthly Monthly Quarterly EAST ROATCAP CREEK - <br />DOWNSTREAM 3.59 sq.ml. Parshall flume and recorder 3' x 30" Sep-82 <br />SW - 7 NO NONE TRIBUTARY TO FIRE MOUNTAIN <br />CANAL 0.72 sq.ml. Crest stage gauge • - Sep-82 <br />SW-8 NO NONE - • - • - - COAL GULCH 0.80 sq.ml. Crest stage gauge • - Sep-82 <br />SW - 9 NO NONE -- - - - • WEST ROATCAP CREEK - UPSTREAM -- Parshall flume and recorder V x 30" Nov-88 Relocated to West Roatcap. Located <br />in East Roatca 07/83 trough 1986. <br />SW - 10 YES NONE Monthly Monthly Quarterly TERROR DITCH - - Parshall flume and recorder 2.5'x 30" Jul-83 <br />SW - 11 NO NONE - - - - • - MAIN ROATCAP CREEK ? Concrete weir and recorder - - Jun-83 Stilling well and recorder attached to <br />weir <br />SW - 12 NO NONE - - - - - - ROBERTS/STUCKER DITCH -- Parshall flume and recorder 2'x 30" Jun-83 <br /> <br />UERC <br />NO <br />NONE <br />• - <br />• - <br />• - <br />EAST ROATCAP - ABOVE WEST MINE <br />? <br />Grab sample point <br />- - Nov-86 Sampling initiated during West Mine <br />construction for TSS, TDS. <br /> <br />LERC <br />NO <br />NONE <br />- - <br />- - <br />• - <br />EAST ROATCAP -ABOVE WEST MINE <br />7 <br />Grab sample point <br />-- Nov 86 Sampling initiated during West Mine <br />construction for TSS, TDS. <br /> <br />NOTES: 1) First quarter and monthly monitoring shall be initiated when sites are accessible. Second quarter and monthly monitoring shall be initiated by no later than May 15 of each <br /> year unless the Division is consulted <br />SW-1 Transferred to the Bowie No. 2 Mine Permit <br />Surface Water Tab <br />PR-04 Volume 4 Revised 06/2010