My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-22_PERMIT FILE - C1981035A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2010-03-22_PERMIT FILE - C1981035A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:02:20 PM
Creation date
6/16/2010 3:24:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/22/2010
Doc Name
RECLAMATION PLAN
Section_Exhibit Name
KII 2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
substation area will be excavated and used for backfill at the portal area. <br />Z) Substation Ground Field: This area is laced with large, bare copper <br />wire for grounding the main electrical substation. This wire will be <br />pulled from the ground and sold as scrap. <br />AA) Main Dumpster Pad: The roll -away dumpster sits on this pad. The <br />dumpster is provided by a local waste disposal service. <br />BBA thru BBB) Slope Conveyor: This 42" conveyor delivers coal from <br />inside the mine to the Coal Stack Tube # 1 & Head House, 20,000 Ton <br />Coal Storage Pile # 1. Part of this conveyor utilizes a covered "box truss" <br />design. <br />CC) Magnet Dumpster Pad #I: A small dumpster sits on this pad to <br />receive the material which is picked up by the belt magnet. The <br />dumpster is provided by a local waste disposal service. <br />DD, DD 1) Coal Stack Tube # 1 & Head House, 20,000 Ton Coal <br />Storage Pile # 1: Coal will be removed from the site prior to reclamation. <br />Any remaining coal or coal fines will be excavated and buried under four <br />(4) or more feet of non -toxic non - combustible backfill (including topsoil). <br />EE) Magnet Dumpster Pad #2: A small dumpster sits on this pad to <br />receive the material which is picked up by the belt magnet. The <br />dumpster is provided by a local waste disposal service. <br />FF thru FF4) Raw Coal Conveyor: 36" conveyor which draws coal from <br />the bottom of the raw coal storage stockpile and delivers it to a coal <br />crusher. <br />GG) Crushing/ Screening Structure: This steel structure processes raw <br />coal. Coal is crushed to a 2" x 0" product for sale to commercial <br />customers and sorted to additional sizes for domestic customers. <br />HH, JJ) Lump & Stoker Conveyors #1 & #2: These 24" radial stacker <br />conveyors are used to stockpile the domestic coal products once they <br />have been screened. These are portable conveyors which will be removed <br />from the site. <br />II, KK) Domestic Coal Piles #I & #2: Raw coal from underground will <br />be delivered to the Coal Crusher/ Screening structure. Larger pieces of <br />coal for domestic use will be separated and stored here using Stacker <br />Conveyors # 1 & #2. This coal will be delivered by truck to an off -site <br />domestic coal sales yard. Provisions will also be made at this area to <br />divert waste rock and lower quality coal for shipment to a refuse pile or <br />for re- blending into the commercial coal product. <br />is Section Energy, LLC King II Mine <br />Section 2.05.4 <br />Page 4 November, 2009 <br />TR -/ s' <br />
The URL can be used to link to this page
Your browser does not support the video tag.