Laserfiche WebLink
• <br /> . ... . ~2~ <br /> <br /> <br />ADJUSTED COSTS <br /> <br />Ownership Costs <br /> <br />Overhaul and Operating Costs of2 <br />heel <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $3.35 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $3.35 NA NA $3.90 $2.43 $4.76 $2.14 NA NA NA NA <br />-Attachment No. 2 : NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $5.51 $2.48 $3.04 NA NA NA NA NA NA NA NA <br />Double shifts : $4.13 $1.24 $1.52 NA NA NA NA NA NA NA NA <br />Triple shifts : $3.67 $0.83 $1.01 NA NA NA NA NA NA NA NA <br />Mech. Ibr: Machine and Attach. No. 1: NA NA NA $3.22 NA $3.93 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $7.32 $1.31 $0.00 $0.35 <br />Attachment No. 2: NA NA NA NA NA NA NA. ~~:::::: <br />$~ ::::: <br />: :$0.00;:;:;;>:;: :; ;:;:;.;$0.00»:>:> :i:s ;:;$0.00::<>:s <br /> ........ ...............:: <br />........ <br />:::::::: . <br />. <br />.; <br />;. <br />:::::: : <br /> <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2 : Basic Machine and Attachment No. 1 <br />Single shifts : $5.51 $2.48 $3.04 $3.22 $2.43 $3.93 $2.14 $7.32 $1.31 $0.00 $0.35 <br />Double shifts : $4.13 $1.24 $1.52 ttachment: <br />Triple shifts : $3.67 $0.83 $1.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />.. <br />HOURLY OPERATOR WAGES <br />Base <br />Fringe <br />F.I.C.A. <br />Unempl. <br />Wk.Comp. <br />Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) <br />Dozer operator (>=70hp) $20.67 <br />$20.67 $7.22 <br />$7.22 $1.58 <br />$1.58 $1.28 <br />$1.28 $2.03 <br />$2.03 $32.78 <br />$32.78 Day : <br />Swing : $0.00 <br />$0.30 Two shift per day average : <br />Three shift per day average : $0.15 <br />$0.25 <br />Mechani $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul Operator Total <br /> Machine Attachments CosUhr ($) <br /> Single shifts : $11.03 $20.69 $0.00 $32.78 $64.50 <br /> Double shifts : $6.89 $20.69 $0.00 $32.93 $60.51 <br /> Triple shifts : $5.51 $20.69 $0.00 $33.03 $59.24 <br /> <br />:;:;::Si:~>:~>:~i:::;::;;:~:a:::•::~;:~;:o:~;;;:::~>:?:~>:~»>:~>:~>:~::~::;i;:~;: ~;:~;:~;;:•>:n::~::~::a:~::o::~>:~::~::o:~: ~:::::~>:~>:~i:?>:; :.:;~;:~;:~:;~:s:~;:.::a:~::~::~s:a:a>:>:~: <br /> ~:~:;~i :~>:<?~:<~>:~;:~:f:> •;:~;:~;:~:a::~;;;:~ ;:~;:~;:~;:~;;:~;:~:;~;:~;:~;:~;;::~>: ~>:~>::~::>:~;:~;:~;:~;:~;:~ ;:<~:~;:~;:~;:~;:;~>:~;:~;:n :~::a:~::~::~>:~::~::•:c:::. ~ :::::::::::::::::::: <br />:: ::::::. ~::::::::::::::::::::::: <br />. <br />::::........... <br />::.: <br />:::::. <br />:.::. <br />EQUIPMENT PERFORMANCE DATA Struck Heaped Weight Weight Length Width Height Min. turning r <br />Horsepowe Fuel <br />Description Type Capacity (cy) Capacity (cy) (UST) (MT) (ft) (ft) (ft) circle (ft) (fhp) type <br />Cat D3G XL - 3P Power Angle Tilt NA NA 8.06 NA 13.17 6.25 9.08 NA 70.00 Diesel <br />Dozer blade NA NA 1.88 1.11 NA NA 8.08 3.08 NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br /> <br />Travel speeds (mph): 1st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forvvard : 1.9 3.8 5.6 NA NA NA NA NA clearance (ft.) height (ft.) <br />Reverse : 2.0 4.0 6.0 NA NA NA NA NA NA NA <br /> <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (Ibs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br /> NA NA NA NA NA NA NA NA NA NA NA <br />NA <br />