Laserfiche WebLink
• • <br />........ ;:;:;:::;:;: ;:;:::::::::;:....... <br />DJUSTED COSTS .... .p.. <br />Ownershi Costs <br /> <br />Depreciation CFC Overhead .. . <br />Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $8.49 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $8.49 NA NA $3.42 $5.90 $2.85 $5.72 NA NA NA NA <br />-Attachment No. 2 : NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $12.81 $7.51 $12.31 NA NA NA NA NA NA NA NA <br />Double shifts : $9.60 $3.76 $6.15 NA NA NA NA NA NA NA NA <br />Triple shifts : $8.55 $2.50 $4.10 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $2.12 NA $1.77 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $17.53 $3.76 $3.64 $0.48 <br />Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br /> <br />ADJUSTED COST SUBTOTALS P ........... <br />Ownershi Costs ... ....... :::: .... ................. ..... ...................... <br />Overhaul and Operating Costs <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2 : Basic Machine and Attachment No. 1 <br />Single shifts : $12.81 $7.51 $12.31 $2.12 $5.90 $1.77 $5.72 $17.53 $3.76 $3.64 $0.48 <br />Double shifts : $9.60 $3.76 $6.15 ttachment: <br />Triple shifts : $8.55 $2.50 $4.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80°~ ($/hr) Shift Differential Colorado labor zone : 2 <br />Grader- rough blad $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Day : $0.00 Two shift per day average : $0.15 <br />Grader- finish blad $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $16.74 $4.20 $1.28 $1.04 $1.64 $24.90 Night : $0.45 <br /> <br />HOURLY EQUIPMENT COST SUMMARY <br />Ownership <br />Operating and Overhaul <br />Operator <br />Total ............: <br /> Machine Attachments CosUhr ($) <br /> Single shifts : $32.63 $40.92 $0.00 $24.47 $98.02 <br /> Double shifts : $19.52 $40.92 $0.00 $24.62 $85.05 <br /> Triple shifts : $15.15 $40.92 $0.00 $24.72 $80.78 <br /> <br /> <br /> <br />:: <br />::::.: <br />:::. <br /> <br />:: <br />::::. <br />:::. <br /> <br />: <br />:.:. <br />:.. <br />:: <br />~ <br />:::::: <br />'::::. <br />~ <br />~ :::::. <br />::: ~:. <br />::::: . <br />:.::. <br /> <br /> <br /> <br /> <br /> <br />QUIPMENT PERFORMANCE DATA <br /> <br /> <br /> <br /> <br />truck <br /> <br /> <br /> <br />~ <br />Hea <br />p <br /> <br /> <br />t <br />Wei <br />9 <br /> <br />Wei <br />ht <br /> <br />9 <br /> <br />n <br />~ <br />Le t <br />g <br /> <br />Width ht <br />Hei <br /> <br />g Min. turnip <br /> <br />9 r <br />Horse owe <br />P F <br />e l <br />u <br />Description Type Capacity (cy) Capacity (cy) (UST) (MT) (ft) (ft) (ft) circle (ft) (fhp) type <br />CAT 14H NA NA NA 20.70 NA 35.00 9.25 10.92 51.84 215.00 Diesel <br />Moldboard NA NA NA NA NA NA 14.00 2.25 NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br /> <br />Travel speeds (mph): 1st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forward : 2.3 3.3 4.4 6.4 9.6 13.5 18.3 26.5 clearance (ft.) height (ft.) <br />Reverse : 2.6 3.6 4.9 7.1 10.7 15.0 20.3 29.4 NA NA <br /> <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (Ibs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />NA NA NA NA NA NA NA NA NA 1.32 NA NA <br /> <br />