Laserfiche WebLink
~ ~ <br />~.... , . <br />.. .. <br />ADJUSTED COSTS ..... P .............. <br />Ownershi Costs :;:::;;:;;:; ......:::............ ............. hee~2 f <br />Overhaul and Operating Costs s o 2 <br /> Overhaul Field Repair <br /> Depreciation CFC Overhead Labor Parts Labor Pans Fuel Lube Tires G.E.C. <br />Acquisition cost : $5.48 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Machine and Attach. No. 1 : $5.48 NA NA $2.00 $4.17 $1.81 $3.67 NA NA NA NA <br />-Attachment No. 2 : NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $8.27 $5.08 $7.95 NA NA NA NA NA NA NA NA <br />Double shifts : $6.20 $2.54 $3.98 NA NA NA NA NA NA NA NA <br />Triple shifts : $5.52 $1.69 $2.65 NA NA NA NA NA NA NA NA <br />Mech. Ibr.-Machine and Attach. No. 1: NA NA NA $1.24 NA $1.12 NA NA NA NA NA <br />-Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/tube -Machine and Attach. No. 1: NA NA NA NA NA NA NA $13.72 $2.73 $2.09 $0.31 <br />Attachment No. 2: NA NA NA NA ........ ........NA........ ........NA.:::.::: ::::.::NA::::::: :::::::$0.00::.;:;: ;:;:;:;:~;;:.;$0.00:;:;:;:;:;:; ~;::::; $0.00>:>: »:::<;$0.00:;:,>: <br />DJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Basic Machine and Attachments No. 1 and No. 2 : Basic Machine and Attachment No. 1 <br />Single shifts : $8.27 $5.08 $7.95 $1.24 $4.17 $1.12 $3.67 $13.72 $2.73 $2.09 $0.31 <br />Double shifts : $6.20 $2.54 $3.98 ttachment: <br />Triple shifts : $5.52 $1.69 $2.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />:; ::::::::::::::....:.:::::::.::::............................ <br />HOURLY OPERATOR WAGES ........... <br />Base <br />Fringe ....... <br />F.I.C.A. p :::: <br />Unem I. :::..:::::::::..P... <br />Wk.Com ....... ....... <br />Total ........ .......... . <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Grader- rough blad $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Day : $0.00 Two shift per day average : $0.15 <br />Grader-finish b/ad $16.39 $4.20 $1.25 $1.02 $1.61 $24.47 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $16.74 $4.20 $1.28 $1.04 $1.64 $24.90 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />CosUhr ($) <br />Single shifts : $21.30 $29.05 $0.00 $24.47 $74.82 <br />Double shifts : $12.72 $29.05 $0.00 $24.62 $66.39 <br />Triple shifts : $9.85 ............ .......... $29:05........... ..........:::::::::.:::::: $0:00:::::: :::::::::::::::::;.;;:;:;:.;$24.72;:;: ;:;:;:;:~;:;:;:;;;:;:~;:;:~;:;:;:;:; $63.62>:>:s:>:>:s <br />EQUIPMENT PERFORMANCE DATA <br />Description Type <br />CAT 12H NA Struck <br />Capacity (cy) <br />NA Heaped <br />Capacity (cy) <br />NA Weight <br />(UST) <br />14.41 Weight <br />(MT) <br />NA Length <br />(ft) <br />32.83 Width <br />(ft) <br />8.00 Height <br />(ft) <br />10.17 Min. turning <br />circle (ft) <br />48.50 Horsepower <br />(fhp) <br />140.00 Fuel <br />type <br />Diesel <br />Moldboard NA NA NA NA NA NA 12.00 2.00 NA NA NA <br />NA NA NA NA NA NA NA NA NA NA NA NA <br />Travel speeds (mph): 1st (or max.) 2nd 3rd 4th 5th 6th 7th 8th Minimum dump Max. dump <br />Forward : 2.1 2.9 4.2 5.7 9.0 12.3 17.0 24.7 clearance (ft.) height (ft.) <br />Reverse : 1.7 3.1 4.5 7.2 13.4 19.5 NA NA NA NA <br />Loader bucket type or Compaction Maximum vertical Max. horiz. Excavator bucket capacity (cy) Lift capacity (Ibs) Max.dig/rip Shank No. <br />Compactor drum type width/pass (ft.) reach height (ft.) reach (ft) small medium large optimal max. reach depth (ft.) spacing shanks <br />,.~~ NA NA NA NA NA NA NA NA 1.52 NA NA <br />