Laserfiche WebLink
• CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 037 State :Colorado Permit/job # : C-81-035 <br />Date :08/13/2007 County :La Plata Abbreviation :none <br />User : TAK Site :King 1 Mine Filename : C035-037 <br />Permit or other job action :Rn-05 <br />Task description :Mobilize/Demobilize <br />for Pond Removal <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 erday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 90T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $24.23 $28.32 $30.84 <br />Operating cost/hour : $30.25 $32.95 $34.62 <br />Operator cosUhour : $26.54 $26.54 $26.54 <br />Helper cost/hour : $22.70 $22.70 $22.70 <br />Total Unit Cost/hour : $103.71 $110.50 $114.69 <br />rA1 I11'f~~C\IT <br />• <br />Machine <br />Description <br />-Cat D8R - 8SU Weight/unit <br />(Tons) <br />52.22 Ownership <br />Cost/hr/unit <br />$49.50 Haul Rig <br />Cost/hr/unit <br />$114.69 Fleet Size <br />(No. units) <br />1 Haul Trip <br />Cost/hr/fleet <br />$164.20 Return Trip <br />Cost/hr/fleet <br />$114.69 DOT permit <br />Cost/fleet <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $164.20 $114.69 $0.00 <br />