Laserfiche WebLink
• <br />.~- <br />April 27, 1990 <br />• <br />_~ <br />National King Coal <br />P.O. Box 2905 <br />Durango, CO 81302 <br />Attention: Brad Gosche <br />Dear Mr: Gosche, ~` ~- ~~ ~ -- ---'- - - <br />As you are aware I iecently visited the mine site to assess reclama- <br />tion requirements and associated costs. Pursuant to that visitation and <br />conversations with your staff and consultants I submit the following for <br />your consideration: <br />1. Contour slopes and waste material (approximately 9,000 <br />cubic yards). Lump sum $15,000.00 <br />2. Distribute topsoil over area. Price includes importing <br />approximately 3,000 cubic yards to supplement the 4200± <br />cubic yards stockpiled on site. Lump sum X25,000.00 - <br />3. Restoration of two drainage areas. Lump Sum ~10,000j.00 <br />4. Removal of structures. Our company would be able to use <br />the material handling systems in our operations as well <br />•as most of the out buildings. We would propose to re- <br />move surface structures at no cost for the salvage <br />value to us. <br />5. Restoration of vegetation. tde would subcontract this <br />item. Discussions with various companies that special- <br />ize in this type of work indicate a cost range of <br />$750.00 to $900.00 per acre. We purpose to acquire the <br />services of such a company and supervise the work for a <br />fee of lOZ of subcontract cost. We would quarantee the <br />cost not to exceed $15,000.00 <br />The total cost of this proposal to National King Coal would be a <br />maximum of X65,000.00 If I can be of additional assistance please <br />contact at your convenience. <br />i:.. <br />Sincerely, _ <br />Ronald W. Pettig.ew <br />President <br />1 '~ <br />303-217-2172 P.O. BOX 2707 <br />25625 MWY. 550160 FAX t 303.259-3631 OURANGO,COLORA00 81302 <br />November 1993 <br />BURNETT <br />CONSTRUCTION CO. <br />