Laserfiche WebLink
[~ <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />MENT MOBILIZATION / DEMOBILI~ <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Task # : 036 State :Colorado Permit/job # : C-87-035 <br />Date :08/13/2007 County :La Plata Abbreviation :none <br />User : TAK Site :King 1 Mine Filename : C035-036 <br />Permit or other job action : Rn-05 <br />Task description :Mobilize/Demobilize <br />for Site Maintenance and Vegetation i <br />»» :., ::::::::::.:::::::::::::::::::::::.,........................................................... <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis : <br />1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 90T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $24.23 $28.32 $30.84 <br />Operating cost/hour : $30.25 $32.95 $34.62 <br />Operator cost/hour : $26.54 $26.54 $26.54 <br />Helper cost/hour : $22.70 $22.70 $22.70 <br />Total Unit Cost/hour : $103.71 $110.50 $114.69 <br />.~~.~ nAwnw of ~ CAIII~MC41T <br />Machine ^r <br />Description Weight/unit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3C Series 3 - 3P 9.00 $9.36 $103.71 3 $339.22 $311.13 $0.00 <br />-CAT 12H 15.71 $17.55 $103.71 3 $363.78 $311.13 $0.00 <br />-Reveg Equipment 20.00 $66.00 $103.71 1 $169.71 $103.71 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $872.71 $725.97 $0.00 <br />sheet 1 of 2 <br /> <br /> <br /> <br />