Laserfiche WebLink
0 Executive Summary <br />The sediment pond as built will handle the runoff from a 10yr -24hr event. The maximum <br />sediment elevation is 7231.9 feet with 2.62 acre -feet of storage capacity and a 60% <br />clean out elevation of 7229.25 with 1.54 acre -feet of storage capacity. <br />• <br />