My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - C1981035A (14)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2010-03-15_PERMIT FILE - C1981035A (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:33 PM
Creation date
6/16/2010 2:19:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2010
Doc Name
RECLAMATION PLAN
Section_Exhibit Name
KII 2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LL) Crushed Coal Storage Conveyor: Crushed coal is moved from the <br />Coal Crusher/ Screening Structure to the Coal Stack Tube 8v Head <br />House, 20,000 Ton Coal Storage Pile #2 via a 36" conveyor. <br />MM, MM I) Coal Stack Tube #2 & Head House, 20,000 Ton Coal <br />Storage Pile #2: Coal will be removed from the site prior to reclamation. <br />Any remaining coal or coal fines will be excavated and buried under four <br />(4) or more feet of non -toxic non - combustible backfill (including topsoil). <br />NN) Cross -belt Coal Sampler: This small steel structure sits on a <br />concrete pad. A motorized arm collects coal samples from the conveyor <br />belt and deposits them in buckets for analysis. <br />00 thru 005) Truck Loadout Conveyor: 36" conveyor which draws <br />coal from the bottom of the crushed coal storage stockpile and delivers it <br />to the Truck Loadout bins. <br />PP) Truck Loadout Structure & Bins: The truck loadout facility will be <br />an automated batch -weigh structure. Coal trucks will arrive under a <br />chute at the bottom of the loadout and a pre - measured amount of coal <br />will be deposited in the trailer. <br />QQ) Truck Scales: These are portable scales that will be removed from <br />the site during reclamation. <br />RR) Coal Sales Building: This 17W' x 21 L' x 10'H structure is a <br />conventional stick -built building. <br />SS, TT) Coal Sales Building Septic Tank and Drain Field: The drain <br />field is comprised of an underground gravel field that will be left in place <br />during reclamation. All pipes to the drain field will be removed and <br />disposed of during reclamation. The tank is a concrete tank that will be <br />broken up and left in place during reclamation. All pipes to the tank will <br />be removed and disposed of during reclamation. <br />W) Coal Sales Building Parking Area: This level area used for <br />temporary storage. Gravel from this area will be buried in place and re- <br />topsoiled or excavated and used for portal backfill. <br />WW) Bermed Topsoil Storage # 1: Stored topsoil from this open pile will <br />be re- spread on the disturbed areas after backfilling and grading. The <br />footprint of the topsoil storage area will be reseeded during re- vegetation. <br />XX) Concrete Truck Wash -Out: This small bermed area is to collect <br />material that is washed from trucks which deliver concrete to the site. <br />• GCC Energy, LLC <br />Section 2.05.4 <br />Page 5 <br />King II Mine <br />November, 2009 <br />7'2-Is <br />
The URL can be used to link to this page
Your browser does not support the video tag.