My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - C1981035A (13)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2010-03-15_PERMIT FILE - C1981035A (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:33 PM
Creation date
6/16/2010 2:19:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2010
Doc Name
MINE PLAN AREA
Section_Exhibit Name
KII 2.05.3 Operation Plan - Mine Plan Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />C� <br />area, nor is the blasting area within 500 feet of an active or abandoned <br />underground mine, no monitoring is proposed. As blasting will not be <br />conducted within one -half mile of any dwellings or structures, no pre - <br />blast surveys are anticipated to be conducted. <br />To ensure compliance with restrictions on peak particle velocity, any <br />blasting at the mine will comply with the limitations on maximum weight <br />of explosives contained in Rule 4.08.4(10)(c)ii). <br />Blasting Schedule <br />GCC Energy will publish a blasting schedule between 10 and 20 days <br />prior to initiating the surface blasting program in the Durango Herald <br />the newspaper of general circulation in the area of the mine. <br />The blasting schedule will: <br />• identify the location of blasting <br />• time periods during which blasting will occur <br />• measures to control access to the blasting area <br />• the pre -blast warning and all -clear audible signals <br />• the unavoidable hazardous conditions which would require <br />blasting outside the approved blasting schedule <br />If changes to the blasting schedule are necessary, the blasting schedule <br />notice will be republished. <br />Unavoidable Hazardous Conditions <br />Blasting will occur during times indicated in the blasting schedule unless <br />dangerous atmospheric or site conditions, as determined by the blaster - <br />in- charge, require detonation to avoid accidental detonation. If so <br />directed by an authorized law enforcement or regulatory agent, blasting <br />may occur outside the times specified in the blasting schedule. <br />Air Blast Limitations <br />Air blast will not exceed the limitations described in Rule 4.08.4(6)(a). <br />On -Site Explosive Storage and Handling Facilities <br />There will be no on -site explosive storage and handling facilities. The <br />licensed blaster will provide storage. <br />• GCC Energy, LLC <br />Section 2.05.3 <br />Page 9 <br />King II Mine <br />November, 2009 <br />Tit - [!�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.