Laserfiche WebLink
2.03.8 - PERMIT TERM INFORMATION <br />• <br />• <br />The anticipated start of each phase of mining activities is discussed in <br />Section 2.05.2 and 2.05.3 Operations Plan. <br />The anticipated number of acres of surface lands to be affected during <br />the 5 year term of this permit and the total life of the permit is: <br />LOCATION rsa a � &-T Surface Facilities 22.36 Acres 5 Year Term ife of O eration <br />7 T—Avrc rmind M ining 295.5 acres 5 Year Term ife of Operation <br />The term of the permit shall be for five (5) years from issuance, renewable <br />under the terms of Rule 2.08.5. <br />• GCC Energy, LLC <br />Section 2.03.8 <br />Page 1 <br />King II Mine <br />November, 2009 r 15- <br />