My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-03-15_PERMIT FILE - C1981035A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035A
>
2010-03-15_PERMIT FILE - C1981035A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:01:33 PM
Creation date
6/16/2010 2:19:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
3/15/2010
Doc Name
COMPLIANCE INFORMATION
Section_Exhibit Name
KII 2.03.5 Compliance Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03.5 - COMPLIANCE INFORMATION <br />• Neither GCC Energy, LLC nor persons controlled or under common <br />control has had a Federal or State mining permit for surface or <br />underground mining operations suspended or revoked in the last five <br />year period since date of issuance of CDRMS Mining Permit C -81 -035. <br />Neither GCC Energy, LLC nor persons controlled or under common <br />control has forfeited a mining bond or similar security deposited in lieu <br />of bond. <br />Two violations have been issued to GCC Energy, LLC /National King Coal, <br />LLC during the three years prior to this revision. <br />NOV CV- 2006 -005 was issued on September 5, 2006 for deviation in <br />underground workings from the currently approved King I mine plan <br />map. The abatement for the NOV was to submit a technical revision to <br />revise the mine plan map and have the revision approved. The technical <br />revision was submitted and approved within the specified timeframes <br />and the NOV was terminated by CDRMS. There were no judicial <br />proceedings pertaining to this NOV. <br />NOV CV- 2008 -002 was issued on July 3, 2008 for deviation in <br />underground workings from the currently approved King I mine plan <br />• map. The abatement for the NOV was to submit a technical revision to <br />revise the mine plan map and have the revision approved. The technical <br />revision was submitted and approved within the specified timeframes <br />and the NOV was terminated by CDRMS. The appeals process is still <br />pending. <br />GCC Energy, LLC King II Mine <br />Section 2.03.5 <br />Page 1 October, 2008 R- !r- <br />
The URL can be used to link to this page
Your browser does not support the video tag.