Laserfiche WebLink
2.03.8 - PERMIT TERM INFORMATION <br />The anticipated start of each phase of mining activities is discussed in Section <br />2.05.2 and 2.05.3 Operations Plan. <br />The anticipated number of acres of surface lands to be affected during the 5 year <br />term of this permit and the total life of the permit is: <br />LOCATION <br />Surface Facilities <br />EXTENT <br />10.88 Acres <br />I DURATION <br />5 Year Term & Life of Operation <br />Underground Mining <br />2046.15 acres <br />5 Year Term 8v We of Operation <br />The term of the permit shall be for five (5) years from issuance, renewable under the <br />terms of Rule 2.08.5. <br />GCC Energy, LLC <br />Section 2.03.8 <br />Page 1 <br />King I Mine <br />November, 2009 Tk- 15 <br />