My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-12_PERMIT FILE - C1981010A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2010-05-12_PERMIT FILE - C1981010A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:50 PM
Creation date
6/16/2010 12:59:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
5/12/2010
Doc Name
pgs 4-249 to 4-263
Section_Exhibit Name
4.9 Soils
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 Another important aspect of the topsoil management at Trapper is ensuring that the proper quality of <br />topsoil is used for reclaiming croplands. As described in Section 2.6, soils found within Trapper Mine's <br />proposed permit area vary in depth, texture, quantity and quality. For these reasons, only certain soils <br />(Artdic Haploboroll, Brycan, Cochetopa, Evanston shallow Variant, Forelle, Savage and Splitro) may be <br />used for reclaiming croplands. Soils may therefore be selectively placed on cropland areas emphasizing <br />the use of these eight soils . Soils considered not suitable for use on cropland because of coarse texture <br />may be mixed with farmland soil in some instances (refer to Section 3.6.3.2). <br />Monitoring of soil removal and replacement is the key to a successful topsoil program because it provides <br />the control needed to ensure the removal of required soil quantities and a stable, uniform depth of soil <br />upon replacement. Both the yards of topsoil stockpiled and the total area of disturbance will be monitored <br />to annually evaluate the topsoil balance status. Details concerning a surplus topsoil abandonment plan, <br />approved with MR-155 in 1997, are given in Appendix G, Section VII. <br />Adequate monitoring is provided during soil salvage and subsequent replacement. Soil moving equip- <br />ment is monitored and supervised from soil salvage through replacement to ensure adequate topsoil <br />quality and quantity are obtained. Also, probing after replacement ensures proper and uniform topsoil <br />depth. Alternative methods that increase control of soil salvage and replacement may be implemented if <br />practicable. <br />• <br />4-263 <br />0 PP-MAY 1 3 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.