My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-14_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2010-06-14_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:24:46 PM
Creation date
6/16/2010 9:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
6/14/2010
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
DRMS
Permit Index Doc Type
Findings
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : <br />04 -Dec -09 <br />Permit <br />C -1994 -082 <br />Site: Yoast Mine <br />User: <br />JRS <br />_ <br />State : Colorado <br />Filename: <br />1C082 -00f <br />County: Routt <br />_ <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase I Bond Release SL -02 <br />Topsoil Replacement Tasks - Tasks 040 -055 <br />Task <br />Task Description <br />Status <br />TASK HOURS <br />DIRECT COST <br />Replace Topsoil from Stoc ile "A" to Pond 010 <br />21.21 <br />$28,889 <br />1 <br />r <br />Replace Topsoil from Stockpile "B" to Shop Area <br />16.22 <br />$22,090 <br />040 <br />2 <br />Replace Topsoil from Stoc ile "C" to Haul Road "B" <br />20.35 <br />$27,718 <br />043 <br />Replace Topsoil from Stockpile "H" to Wadge Pit <br />57.41 <br />$78,198 <br />044 <br />Replace Topsoil from Stockpile "I" to Wadge Pit <br />58.05 <br />$79,071 <br />045 <br />Replace Topsoil from Stockpile "K" to Wadge Pit <br />77.26 <br />$105,244 <br />046 <br />Replace Topsoil from Stockpile "L" to Wadge Pit <br />81.28 <br />$110,720 <br />047 <br />Replace Topsoil from Stockpile "M" to Wadge Pit <br />120.07 <br />$163,552 <br />048 <br />Replace Topsoil from Stockpile "O" to Wadge Pit <br />128.20 <br />$174,630 <br />049 <br />Replace Topsoil from Stockpile "P" to Wadge Pit <br />99.26 <br />$135,213 <br />050 <br />Replace Topsoil from Stockpile "Q" to Wadge Pit <br />137.47 <br />$187,260 <br />051 <br />Replace Topsoil from Stockpile "R" to Wadge Pit <br />150.63 <br />$205,180 <br />052 <br />Replace Topsoil from Stockpile to Drill Pads from Minor Revision 18 <br />0.77 <br />$653 <br />053 <br />Replace Topsoil from Stockpile to Access Road to Drill Pad #2 from MR -18 <br />0.29 <br />$248 <br />0547 - - - <br />Replace Topsoil -fiom Stockpild to Temporary Access -R6dd to-Pond-0T0 - - "- - - - - - <br />-- - -- - <br />- - - - - - <br />- - - -- 0.29 - -- - <br />- - - - - -$245 <br />055 <br />Replace Topsoil from Stockpile "M" to Additional Disturbance from TR -21 <br />14.31 <br />$19,493 <br />i <br />Total Direct Cost <br />983.07 <br />$1,339,404 <br />1rs <br />Page 6 <br />04 -12 -09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.