My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-14_GENERAL DOCUMENTS - C1994082
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1994082
>
2010-06-14_GENERAL DOCUMENTS - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 3:24:46 PM
Creation date
6/16/2010 9:59:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
General Documents
Doc Date
6/14/2010
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
DRMS
Permit Index Doc Type
Findings
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - -- — — YoasfMine G1-994= 082 —_._ ---------------------------- <br />Partial Phase I Bond Release SL -02 Surnmart Sheet <br />PROJECT IDENTIFICATION <br />Date : <br />04- Dec -09 <br />Permit <br />C- 1994 -082 <br />Site: Yoast Mine <br />User. <br />JRS <br />State : Colorado <br />Filename: <br />C082 -000 <br />County: Routt <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase I Bond Release SL -02 <br />Task <br />Task Description <br />TASK HOURS <br />DIRECT COST. <br />00a <br />Hi hwall Reduction and Backfilling and Rough Grading Tasks - Tasks 01a -005 <br />166.68 <br />$140,847 <br />00b <br />Ripping Tasks - Tasks 010 -014 <br />37.05 <br />$32,126 <br />00c <br />Road Reclamation Tasks - Tasks 018 -025 <br />177.85 <br />$50,130 <br />00d <br />Finish Grading Task - Task 028 <br />43.77 <br />$5,092 <br />00e <br />Drainage Control System Removal Tasks - Tasks 030 -037 <br />945.23 <br />$246,122 <br />00f <br />Topsoil Replacement Tasks - Tasks 040 -055 <br />983.07 <br />$1,338,404 <br />Dog <br />Borehole Sealing and Demolition Tasks - Tasks 060 and 063 <br />354.00 <br />$195,085 <br />00h <br />Revegetation Tasks - Tasks 065 -072 <br />_ _ <br />1887.60 <br />$1,025,567 <br />00i <br />Miscellaneous Reclamation Tasks - Tasks 080 and 081 <br />1253.77 <br />$446,675 <br />00j <br />_ <br />Mobilize/Demobilize Equipment Tasks - Tasks 085 -087 <br />17.42 <br />$62,095 <br />Direct Cost Total <br />5,866.44 <br />$3,542,143 <br />INDIRECT COSTS <br />Overhead and Profit <br />Liability Insurance (2.02% of Direct Costs) <br />$71,551 <br />Performance Bond (1.05 %0 of Direct Costs) _ <br />$37,193 <br />Job Superintendent (at $52.10/hour) <br />$0 <br />Profit (10.00% of Direct Costs) <br />$354,214 <br />Total Overhead and Profit <br />$462,958 <br />Contract Amount (Direct Costs + Overhead and Profit) <br />$4,005,101 <br />Le al -.Engineering - Proiect Mana ement <br />Engineering Work and Contract/Bid Preparation (4.25% of Contract) <br />$170,217 <br />Reclamation Management and Administration (3.25% of Contract) <br />$130,166 <br />TOTAL BOND AMOUNT <br />$4,305,4841 <br />jrs Page 1 04 -12 -09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.