Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCROPFR - ONLY WnRK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task #: 050 State : Colorado Permit/job #: C 2006 - 085 <br />Date: 0311712010 County : Fremont Abbreviation : none <br />User: JRS Site : Northfield Mine Filename : C085-050 <br />Permit or other job action : Technical Revision 1 <br />Task description : Replace Topsoil to Power Line Light -Use Road <br />HOURLY EQUIPMENT COST <br />Model: Cat 621G Shift basis: 1 per day <br />Cost Breakdown : <br />pounds /LCY <br />Job utilization % <br />Horsepower : 365 <br />Ownership cost/hour : <br />$55.14 <br />NA <br />Weight (UST) : 35.55 <br />Operating cost/hour: <br />$79.09 <br />100 <br />Cost data source : (CRG) <br />Operator cost/hour : <br />$24.98 <br />NA <br />Rated payload: 48,000 <br />Total unit cost/hour : <br />$159.21 <br />Total fleet cost/hour : <br />$159.21 <br />MATERIAL QUANTITIES <br />LCY <br />Adjusted capacity: <br />17.50 <br />Initial <br />Swell <br />Loose <br />Loading time: <br />volume: 210 CCY <br />factor : <br />1.125 volume: <br />236 LCY <br />Source of quantity take -off : Page 2.05.4 -7; Map 12 <br />Source of estimated swell factor CAT Handbok <br />HO <br />OURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weight) Basis: I Scraper Bowl (volume) B asis: <br />Material weight: 2,550 <br />pounds /LCY <br />Struck volume: <br />14.00 <br />LCY <br />Material description : <br />Travel time (min.) <br />Heaped volume: <br />21.00 <br />LCY <br />Earth - Dry packed <br />5.0 <br />Average volume: <br />17.50 <br />LCY <br />Rated payload: 48,000 <br />pounds <br />500 <br />-1.0 <br />1 5.0 <br />Payload capacity: 18. 82 <br />LCY <br />Adjusted capacity: <br />17.50 <br />LCY * "* <br />Adjusted fleet production : <br />Cycle Time (load + haul + spread + return) : <br />Loading time: <br />2.00 <br />minutes <br />Maneuver and spreading time : <br />0.70 <br />minutes <br />Travel time: <br />• loading time per pair on push -pull models <br />Fleet size: 1 Scraper(s) <br />Total job time: <br />Route <br />Distance (feet) <br />Grade ( %) <br />Roll. res.( %) <br />Total res.( %) <br />Velocity (fpm) <br />Travel time (min.) <br />minutes <br />Haul : <br />500 <br />1.0 <br />5.0 <br />6.0 <br />1,204 <br />0.49 <br />minutes <br />Return: <br />500 <br />-1.0 <br />1 5.0 <br />4.0 <br />2,763 <br />0.18. <br />minutes *.* <br />travel time adjusted for acceleration and deceleration at load and dump points <br />velocities are max. attainable per total resistance shown not average <br />Total cycle time <br />3.37 <br />minutes <br />Job Condition Correction Factors : <br />Site altitude (feet) : 5,400 <br />Adjusted Hourly Production ; <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Unadjusted unit production : <br />311.71 <br />LCY /Hour * ** <br />Job efficiency factor: 0.83 (1 shift/day) <br />Adjusted unit production : <br />258.72. <br />LCY /Hour <br />Adjusted fleet production : <br />258.72 <br />LCY /Hour <br />Net job correction factor: 0.83 <br />*" 2 times volume on push -pull models <br />�:- <br />JOB TIME AND COST <br />Fleet size: 1 Scraper(s) <br />Total job time: <br />0.91 <br />Hours <br />Unit cost: $0.615 /LCY <br />Total job cost : <br />$145 <br />W <br />